Target costing
Quick answer. Target costing starts from an uncomfortable truth: by the time a product reaches the factory floor, most of its cost is already decided. Eighty to ninety per cent of what a product will cost is locked in at the design stage, long before the first unit is made.
Target cost = target price - target profit