CostCtrl: cost and profitability software built on TDABC.
CostCtrl is cost control software built on Time-Driven Activity-Based Costing (TDABC). Rather than tracking spend against a budget, it traces every euro from the general ledger to the customer, product and channel that consumed it, priced at what a minute of each team actually costs. An AI layer reads the model so your controllers do not have to.
Three steps to your first profitability model.
Connect your general ledger, ERP extract, or spreadsheet. CostCtrl accepts any tabular data format.
Map cost pools, define time equations, and assign activities. The guided workflow handles the TDABC logic.
See your Whale Curve, run scenarios, and export board-ready reports. Insights from day one.
Four views that turn data into decisions.
Multi-dimensional treemap
Profit and revenue nested, sized and coloured by margin. Drill from business unit to customer to SKU in a single click. The shape of the map is the shape of your business.
Whale-curve reporting
Cumulative profitability ranked line by line. See exactly which customers generate the peak and which drag it down, and where the profit really comes from.
Scenario simulation
Change a price, cost driver or volume assumption and watch the whale curve, treemap and P&L reshape in real time. Test before you commit.
Model workflow
A guided build process: data ingestion, cost drivers, activities, allocations. Each step validated before the next. No spreadsheet spaghetti.
It reads the model so your controllers don't have to.
The AI layer narrates the model. It reads every cost pool, every allocation, every margin line and surfaces the insights that matter: which customers turned negative this quarter, which cost driver moved, and what to do about it.
No more 200-page Excel reports that nobody reads. The AI delivers a three-line brief every Monday morning, written in the language of the business, not the language of accounting.
Channel Export turned negative in Q2. Margin eroded against Q1, driven by freight surcharge absorption.
Top loss contributor: SKU-0808 (Valve Assembly 16mm). Unit cost exceeds price.
Suggested move: Reprice or discontinue the bottom 3 lines in the Export channel, then test the effect in a scenario.
What a TDABC model in CostCtrl needs from you.
Search for cost control software and most of what comes back tracks spend against a budget: purchase orders, project costs, approval workflows. CostCtrl answers a different question. It does not ask whether a department stayed within budget; it asks what each customer, product, order and channel actually costs to serve, and whether the price covers it. That makes it a costing engine more than a control tool, and the model inside it is built with Time-Driven Activity-Based Costing, the method Robert Kaplan and Steven Anderson set out in Harvard Business Review in 2004.
The inputs are ordinary. We ask for twelve months of the general ledger, sales by invoice line and headcount by department. We also ask for one person in finance with time reserved each week, because a time equation is only as good as the answers behind it: how long a rush order takes to pick, how many minutes a credit check takes, how often a delivery needs a booked slot. The files a first model draws on, and what each one is for, are listed in the data needed for a TDABC model.
From there the build follows the four stages shown in the workflow card above: data, drivers, activities, allocations. CostCtrl reads the ledger and the transactions and proposes cost pools, candidate drivers and account mappings, which the analyst then validates. Each team becomes a resource group with a capacity cost rate: what the team costs, divided by the minutes it can practically supply. Each activity gets a time equation, a base time plus extra minutes for each feature that makes the work longer, as explained in TDABC time equations. The model is defined once and rerun against each new month of data, so a figure in the board pack can be traced back to the driver and the transaction that produced it.
The person you meet on the first call is the person who builds your model. The Build and Embed phase typically takes 4 to 8 weeks; where it lands in that range depends mostly on how clean the ledger extract is and how quickly the team confirms the time estimates. How the work runs, week by week, is described in how we work.
How the capacity cost rate and unused capacity appear in the model.
An illustrative example, with invented figures. A distributor runs an order desk of six people. Salaries, employer charges, office space and systems for the team come to €345,600 a year. Each person can practically supply 1,600 hours, so the team offers 576,000 minutes, and the capacity cost rate is €0.60 a minute. The time equation for handling an order is 3 minutes per order, plus 0.5 minutes per line, plus 8 minutes when the order is a rush.
| Line in the model | Volumes | Minutes | Cost at €0.60 |
|---|---|---|---|
| Customer A, a wholesaler | 1,200 orders, 36,000 lines, 20 rush | 21,760 | €13,056, or €10.88 an order |
| Customer B, a chain of small shops | 4,800 orders, 19,200 lines, 600 rush | 28,800 | €17,280, or €3.60 an order |
| All other customers | same equation | 410,240 | €246,144 |
| Capacity used | 80% of 576,000 | 460,800 | €276,480 |
| Unused capacity, its own line | 20% of 576,000 | 115,200 | €69,120 |
| Team cost, reconciled to the ledger | 576,000 | €345,600 |
Two things show up that a budget report does not. Customer A places a quarter as many orders as customer B, yet each of its orders costs three times as much to handle, because the lines drive the minutes. And 115,200 minutes, €69,120 of the team, are paid for and not used. In CostCtrl that amount stays on a line of its own, per resource group and per month, where someone can decide what to do with it.
The alternative is to divide the whole €345,600 by the 460,800 minutes actually used. The rate becomes €0.75, a quarter higher, and customer B is charged €21,600 instead of €17,280, or €4.50 an order instead of €3.60. Nothing about how B orders has changed; it has simply been handed part of the idle time. Repricing B on that number is how a quiet month turns into a lost customer. Why unused capacity belongs in a separate line, and how to read it, is set out in the cost of unused capacity.
Financial reporting reaches a similar conclusion for inventory: IAS 2, paragraph 13, allocates fixed production overheads on the basis of normal capacity and expenses the unallocated part in the period, so that low volume does not inflate unit cost. A management model can go further, and show the idle minutes by team and by month rather than as a single variance at year end.
Sources: R. S. Kaplan and S. R. Anderson, “Time-Driven Activity-Based Costing”, Harvard Business Review, November 2004. IFRS Foundation, IAS 2 Inventories, paragraph 13.
See CostCtrl at work.
The live demos show CostCtrl models built on illustrative companies: cost and margin by customer, product and channel. Open one and follow where the margin is made and where it is lost.
The model behind the platform, in one real result.
For a distribution group, the TDABC model built in CostCtrl ranked 1,951 customers and found 830 destroying value. It made €1.335M of hidden cost-to-serve visible, and 535 of those accounts were brought back to break-even or better through pricing and service changes, without losing the revenue.
Read the case study →Questions about CostCtrl
What is CostCtrl?+
CostCtrl is an AI-enabled profitability analytics platform that automates the TDABC workflow: importing ERP and accounting data, defining cost pools and time equations, computing unit costs, and generating profitability dashboards including Whale Curve analysis.
Is CostCtrl an alternative to SAP PCM?+
For many profitability and cost-allocation use cases, yes. CostCtrl is a modern, cloud-based alternative for organisations migrating away from legacy cost-and-profitability tools such as SAP PCM, offering AI-assisted model setup and a far faster time to value.
How is CostCtrl different from other costing software?+
Unlike generic ABC tools, CostCtrl is purpose-built for Time-Driven ABC and pairs the software with deep consulting expertise and AI automation, so models are both fast to build and methodologically correct.
Do we build the model, or does your team?+
We build the first model with you and then hand you the keys. You own the live model on your own data; we stay available for reviews and deeper analysis when you want them.
Why not just build the model in a spreadsheet?+
Spreadsheet TDABC models work for a first pilot and then stop scaling. They struggle with the transaction volumes a real model needs, millions of records; version control breaks down as soon as more than one person edits; auditability is limited, because tracing how a particular cost allocation was calculated is hard; and maintenance is heavy, because one change to a time equation has to be repeated by hand across several worksheets. CostCtrl was built to remove those four limits.
What is cost control software, and is CostCtrl one?+
Cost control software usually means budgeting and spend tracking: approvals, purchase orders, project budgets. CostCtrl sits next to that rather than replacing it. It is costing software built on Time-Driven Activity-Based Costing, so instead of comparing spend with budget it calculates what each customer, product, order and channel costs to serve, from the minutes each activity takes and the cost of a minute of each team. The result is profit by customer and product, not a variance report.
Is CostCtrl TDABC software?+
Yes. CostCtrl was built for Time-Driven ABC. Each team is a resource group with a capacity cost rate, the cost of the team divided by the minutes it can practically supply, and each activity has a time equation: a base time plus extra minutes for whatever makes the work longer. Unused capacity is reported as its own line, per resource group and per month, rather than spread over the rates.
What data does a first CostCtrl model need?+
Twelve months of the general ledger, sales by invoice line and headcount by department. On top of the files, one person in finance with time reserved each week, to confirm the time estimates and the account mappings that the platform proposes. Much of the work in the first weeks is reconciling the model back to the ledger, so a clean extract shortens the build.
How long does it take to build the first model?+
The Build and Embed phase typically takes 4 to 8 weeks. Where it lands in that range depends mostly on the quality of the ledger extract and on how quickly the team confirms the time equations. The person you meet on the first call is the person who builds the model, so the questions asked in week one are the ones that shape the model you receive.
How do we get started?+
Start with the Profit Check, a 10 minute diagnostic. Most engagements begin with a fixed-price ProfitAudit 360 that produces the first model in weeks.
Your profitability model is waiting to be built.
Start with the Profit Check, a 10 minute diagnostic that typically shows where to look first.