Skip to content
Cost method

Kaizen Costing and Continuous Cost Improvement

Kaizen costing is the Japanese manufacturing discipline that drives cost down during production through many small, continuous improvements. It is the operating-phase partner to target costing, which designs cost out before a product is ever built.

Take the Profit Check

Ten minutes, fourteen questions, the full result on screen, after your name, organisation, work email, industry and size. If you already trust your margin by customer, you do not need it.

Method fileNº KCEN · Global edition

Kaizen Costing and Continuous Cost Improvement

Quick answer. Kaizen costing is the Japanese manufacturing discipline that drives cost down during production through many small, continuous improvements. It is the operating-phase partner to target costing, which designs cost out before a product is ever built.

Family
Cost method
Reading
7 min
Editions
6 editions
Author
Miguel Guimarães
In brief

Kaizen costing is the practice of setting and pursuing a planned rate of cost reduction across the production life of a product, achieved through continuous, incremental improvements on the shop floor rather than a single redesign. The word kaizen means "change for the better", and the method was formalised in Japanese manufacturing - closely associated with Toyota and documented by Yasuhiro Monden. Where target costing engineers cost out of a product before launch, kaizen costing keeps pushing it down afterward: each period carries a kaizen cost-reduction target, usually a small percentage of current cost, that operators and teams are expected to meet through better methods, less waste, shorter setups and steadier flow. The two methods form a chain - target costing sets the entry cost, kaizen costing bends the cost curve downward through the whole production run - and both answer to the same market-driven ceiling on what a product is allowed to cost.

The core idea

Improving the cost of what already exists

Standard costing asks whether actual cost met a fixed engineering standard, and treats holding the line as success. Kaizen costing rejects the standing standard: it assumes that today's cost is never the floor, and that a modest reduction is expected every period, indefinitely. The reference point is not a static standard but the previous period's actual cost, ratcheted down by a target. Meeting last period's cost is not good enough; the goal is to beat it, and then beat that.

The improvements are deliberately small and local. Kaizen costing does not wait for a capital project or a product relaunch. It harvests cost from the everyday - a shorter changeover, a fixture that removes a step, a layout that cuts walking distance, a defect chased back to its cause. Responsibility sits with the people doing the work, supported by industrial engineering, because they see the waste first. Individually each gain is trivial; compounded across a workforce and a year, they move the number that matters.

How it fits

Target costing designs cost out; kaizen costing drives it down

Target costing works in the design phase, before a single unit is made. It starts from the price the market will bear, subtracts the required margin, and derives an allowable cost that the product must be engineered to hit. The great majority of a product's lifetime cost is locked in here, in the choices of design, materials and process. Once production begins, most of that cost is committed and hard to move.

Kaizen costing takes over from launch. It accepts the design as given and attacks the cost that remains variable in the making - labour, materials yield, energy, rework, setup. Its lever is continuous improvement rather than redesign, and its horizon is the full production life of the product. In Monden's account the two are complementary stages of a single cost-management system: target costing sets an aggressive entry point, kaizen costing prevents cost from drifting back up and instead pulls it steadily lower. Neither works alone. A brilliant target cost erodes without kaizen discipline; kaizen effort on a poorly designed product hits a wall the redesign should have removed.

The method is on this page. What it would find in your numbers is not. The Profit Check scores seven dimensions of your costing in ten minutes and names the gap worth closing first. If you already have your margin by customer and by product in a number you trust, you do not need it.

Take the Profit Check
A worked example

A kaizen reduction target across a year

Take a component that currently costs €40.00 a unit to produce, made at 100,000 units a year, so annual production cost is €4,000,000 (illustrative figures, not client data). Management sets a kaizen cost-reduction target of 3% for the year, allocated evenly across four quarters at roughly 0.75% each.

The full-year goal is a €120,000 reduction (3% of €4,000,000), taking unit cost from €40.00 toward €38.80 by year end. Quarter by quarter the target ratchets from the prior actual: about €30,000 of savings each quarter, found in specific improvements - a €0.30 material-yield gain from less scrap, a €0.40 labour gain from a shorter setup, a €0.50 gain from fewer defects and reduced rework. If the first quarter delivers only €24,000, the shortfall of €6,000 is not written off; it rolls into the pressure on the next period, because the reference cost for Q2 is the Q1 actual, not the original standard. Over the run, a sustained 3% annual pace compounds: a €40 unit cost held to that rate reaches roughly €36.5 within three years, entirely from incremental shop-floor gains rather than any redesign.

Two methods side by side

Kaizen costing versus target costing versus standard costing

DimensionTarget costingKaizen costingStandard costing
When it actsDesign phase, before productionProduction phase, across the product lifeProduction phase, per period
Cost referenceMarket-derived allowable costPrevious period's actual, ratcheted downEngineered standard, held fixed
Main leverDesign, materials, process choiceContinuous incremental improvementVariance control against the standard
Attitude to current costNot yet committed - design it outNever the floor - beat it every periodAcceptable if the standard is met
Who owns itDesign and cross-functional teamsOperators and shop-floor teamsManagement accounting and supervisors

The table shows why the three are not rivals but a sequence. Target costing decides what a product is allowed to cost; kaizen costing keeps that promise through the run; standard costing, in its classic form, only asks whether a frozen expectation was met. Together the first two form a continuous market-to-shop-floor cost chain, which is the wider theme of this encyclopedia: understanding true cost-to-serve, reading a customer whale curve, and grounding both in time-driven activity-based costing (TDABC) so that product and customer profitability rest on real resource use rather than an unchallenged standard.

Strengths & limits

When kaizen costing earns its keep

Strengths. Kaizen costing sustains cost pressure long after launch, when standard costing tends to declare victory. It engages the people closest to the waste, so improvement ideas come from where the work happens, and it builds a culture in which cost reduction is continuous and expected rather than a crisis response. In a stable, repetitive manufacturing setting with a long production run, the compounding effect of small gains is substantial and durable.

Limits. The method assumes there is cost still to be squeezed from the process; on a well-designed, mature product the easy gains eventually run out and the pressure can feel relentless to the workforce if not managed with care. It is weakest where the real cost driver is design or complexity that kaizen cannot reach - that cost belonged to the target-costing stage. And a target expressed only as a blanket percentage can push teams toward corner-cutting rather than genuine improvement unless quality and safety are protected as hard constraints.

Limits

The limits: when kaizen costing has nothing left to find

Kaizen costing assumes a long, repetitive production run with cost still to be taken out of the making. It does not serve a job shop, a project business or a short product life, where the process is not stable for long enough for small gains to compound, and it does not serve a product whose cost was locked in by design, because no amount of shop-floor improvement reaches a bill of materials. I would also be careful with a target set as a flat percentage across every line: on a mature product the easy gains run out, and a target that keeps ratcheting after that tends to be met by cutting corners rather than cost.

FAQ

Frequently asked questions

What is kaizen costing?
Kaizen costing is a cost-management method that sets a continuous cost-reduction target for a product during its production phase and pursues it through many small, incremental improvements on the shop floor. The reference is the previous period's actual cost, ratcheted down each period, rather than a fixed engineering standard.
How is kaizen costing different from target costing?
Target costing works in the design phase and engineers cost out of a product before it is made, starting from the price the market allows. Kaizen costing works during production and drives the remaining cost down through continuous improvement. Target costing sets the entry cost; kaizen costing keeps bending the cost curve lower across the production run.
How is kaizen costing different from standard costing?
Standard costing compares actual cost to a fixed standard and treats meeting that standard as success. Kaizen costing refuses to treat any cost as the floor: it expects a reduction every period and uses the prior actual cost, lowered by a target, as the new reference. One defends a static expectation; the other assumes cost should always fall.
Who is associated with kaizen costing?
The approach grew out of Japanese manufacturing practice, most closely associated with Toyota, and was documented and formalised in the management-accounting literature by Yasuhiro Monden, alongside broader work on target costing and lean production systems.
Where does kaizen costing work best, and where does it struggle?
It works best in stable, repetitive manufacturing with long production runs, where small gains compound over time and shop-floor teams can see and remove waste. It struggles when the dominant cost driver is locked in by design or complexity, which belongs to the target-costing stage, and when a blanket percentage target risks quality unless safeguards are set.
What is the difference between kaizen costing and kaizen budgeting?
Kaizen budgeting writes the expected improvement into the budget: each period's budgeted cost already assumes the planned reduction. Kaizen costing is the wider practice of setting those reduction targets and pursuing them on the shop floor. The budget is where the target is recorded; kaizen costing is how it is met.
Is kaizen costing the same as continuous improvement?
Not quite. Continuous improvement, kaizen, is the operating habit of many small changes. Kaizen costing puts a money target on that habit, period by period, and checks whether the improvements actually lowered unit cost, as in the worked example on this page.
Sources

References

Monden, Y. Toyota Production System and Cost Reduction Systems: Target Costing and Kaizen Costing (foundational treatment of kaizen costing). · Imai, M. Kaizen: The Key to Japan's Competitive Success (the kaizen philosophy of continuous improvement). · Horngren, C. T., Datar, S. M. & Rajan, M. V. Cost Accounting: A Managerial Emphasis (kaizen and target costing in cost management). · Cooper, R. & Slagmulder, R. Target Costing and Value Engineering (design-phase cost management and its link to continuous improvement). · CIMA, Official Terminology (definitions of kaizen costing and target costing).

The Cost-to-Serve Index

See where you stand on the profitability curve.

The Cost-to-Serve Index is an 8-minute read on how well your business sees the true cost of serving each customer. Take it before a Profit Check, and know your starting point. Your name, company and work email get you the score.

Take the 8-minute Index →8 minutes · name, company, work email · instant score

Proof

A distributor in New Zealand. €1.335M of cost-to-serve made visible, then halved, and 830 loss-making customers brought down to 295.

Read the case study →

Who you would be talking to

Miguel Guimarães, Founding Partner

Cost and profitability practitioner for 25+ years. Presented the Damco cost-to-serve case at Managing for Profit (Amsterdam RAI, December 2009), on the same programme as Robert S. Kaplan.

Call +351 910 313 731

Workshops

Bring the method into the room.

One working profitability model, built from real data, that you take home at the end.

See upcoming workshops
Miguel Guimarães

Reviewed by

Miguel Guimarães

Founding Partner, Cost and Profitability Consulting

Time-Driven ABC engagements since 2010, working within the Kaplan and Anderson framework.

About the author →

Published

M
Ask us anything
usually replies in minutes
Hi. I can answer the quick questions about cost, method and timing right here. For anything specific to your business, I'll connect you with a CostCtrl specialist on WhatsApp.
No bot loops. Straight to a specialist.
Most read
  1. 1Time-driven activity-based costing: ABC made simple and scalable
  2. 2Whale Curve: Definition, How to Build One, Live Simulator
  3. 3Cost-Volume-Profit (CVP) and Break-Even Analysis
  4. 4How to calculate cost to serve, step by step
  5. 5Cost-to-Serve Analysis
  6. 6Make-or-Buy and Relevant Costs
  7. 7TDABC vs ABC: same goal, very different effort
  8. 8Pocket Price Waterfall and Price Realization
  9. 9Transfer Pricing for Internal Profitability
  10. 10Cost-to-Serve, Profitability and AI: Executive Workshop Porto - November 27, 2026