Time-driven activity-based costing: ABC made simple and scalable

Time-driven activity-based costing (TDABC) is a costing method that assigns resource costs to products, services and customers using two parameters: the cost of a minute of capacity and the minutes each transaction takes. It is what activity-based costing became once its creators had lived with its weaknesses. Classic ABC was accurate but expensive: it leaned on endless employee surveys, grew unmanageable as activities multiplied, and quietly assumed that everything ran at full capacity. TDABC keeps the goal, costing products and customers by what they really demand, but reaches it with a radically simpler machine. Instead of a cost pool and a survey for every activity, it needs only two things per group of resources: how much it costs to supply a minute of capacity, and how many minutes each transaction takes.

That shift does more than save effort. By measuring the cost of supplying capacity and the time work actually consumes, TDABC makes the gap between the two, unused capacity, visible for the first time, rather than burying it in inflated rates. The method is the engine under most modern profitability and cost-to-serve work, and this profile sets out where it came from, how its two parameters fit together, and the honest limits the later literature has identified. For the full working reference, with the capacity cost rate derived rather than asserted and a worked example that closes back to the cost base, see time-driven activity-based costing, worked out in full.

Take the Profit Check

Ten minutes, fourteen questions, the full result on screen, after your name, organisation, work email, industry and size. If you already trust your margin by customer, you do not need it.

Key point

Time-driven activity-based costing (TDABC) is a costing method that assigns the cost of resources to products, services and customers using just two parameters per resource group: a capacity cost rate, the cost of supplying capacity divided by the practical capacity available, and time equations that estimate how many minutes each transaction consumes. It was developed by Robert S. Kaplan and Steven R. Anderson, set out in their 2004 Harvard Business Review article and their 2007 book, building on the capacity-costing ideas in Kaplan and Cooper's Cost and Effect (1998). Because it works in units of time rather than activity surveys, TDABC is far faster and cheaper to build and maintain than classic ABC, scales to enterprise size, draws directly on ERP and CRM data, captures real-world variety through its time equations, and, crucially, surfaces unused capacity explicitly. Critics note that its accuracy depends on the quality of the time estimates and that it is harder to apply to non-routine knowledge work. It is the method most modern customer-profitability and cost-to-serve analysis runs on. In two lines: capacity cost rate = cost of capacity supplied / practical capacity, and cost of a transaction = minutes from its time equation × capacity cost rate.

Where it came from

Where it came from

Time-driven activity-based costing was developed by Robert S. Kaplan and Steven R. Anderson. Anderson had pioneered the time-based approach to activity costing in his consulting practice, working with companies to make activity-based costing practical at scale. The conceptual ground had already been prepared: a chapter of Kaplan and Cooper's 1998 book Cost and Effect set out the idea of costing the supply of resource capacity, the seed from which TDABC grew.

The method was formally introduced to a wide audience in Kaplan and Anderson's article "Time-Driven Activity-Based Costing", published in the Harvard Business Review, Volume 82, Number 11, in November 2004, pages 131 to 138. They then developed it in full in their book Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits (Harvard Business School Press, 2007). The framing throughout is deliberately practical: TDABC is presented not as a rival theory of cost but as the way to get the benefits of activity-based costing without the implementation burden that had caused so many ABC projects to stall or be abandoned.

Sources: Kaplan, R. S. & Anderson, S. R. "Time-Driven Activity-Based Costing", Harvard Business Review, November 2004. · Kaplan, R. S. & Anderson, S. R. Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits, Harvard Business School Press, 2007. · Kaplan, R. S. & Cooper, R. Cost & Effect: Using Integrated Cost Systems to Drive Profitability and Performance, Harvard Business School Press, 1998.

How it works
Time equals a base time plus the sum of each driver multiplied by its unit time, all priced at the capacity cost rate. Illustrative example beneath. time = base + Σ ( driver × unit time ) 26 min per order + 12 × complexity lines, checks + 26 × urgent rush handling + support measured min × capacity cost rate (€/min) cost follows behaviour, not size illustrative Time equals a base time plus the sum of each driver multiplied by its unit time, all priced at the capacity cost rate. Illustrative example beneath. time = base + Σ ( driver × unit time ) 26 min per order + 12 × complexity lines, checks + 26 × urgent rush handling + support measured min × capacity cost rate (€/min) cost follows behaviour, not size illustrative
One equation per activity, priced at the practical capacity rate.

How it works

TDABC reduces the machinery of activity-based costing to two parameters for each group of resources that does broadly similar work (a department, a process, a team). Everything else follows from them.

Parameter one: the capacity cost rate

The first parameter is the capacity cost rate: the cost of supplying capacity divided by the practical capacity available to do work.

  • The numerator is the total cost of the resource group over a period, salaries, supervision, equipment, occupancy, technology, everything needed to make that capacity available.
  • The denominator is the group's practical capacity, not its theoretical maximum. People and machines do not work every paid minute; time goes to breaks, training, maintenance and slack. Practical capacity is therefore usually estimated at around 80 to 85 per cent of theoretical capacity.

Dividing one by the other gives the cost of a single unit of capacity, normally a cost per minute. In the original presentation, a resource group costing USD 560,000 with a practical capacity of 700,000 minutes gives a capacity cost rate of USD 560,000 / 700,000 = USD 0.80 per minute.

Parameter two: time equations

The second parameter is a set of time equations that estimate how many minutes each transaction takes. This is what gives TDABC its power to handle variety without a separate activity for every case. A time equation starts with a base time and adds increments for the features that make a particular transaction take longer.

A worked illustration from the original work: a packaging time might be expressed as 0.5 + 6.5 (if special handling is required) + 0.2 (if the order is shipped by air). A standard order takes 0.5 minutes; one needing special handling takes 7.0; one needing both special handling and air shipping takes 7.2. One equation, fed by data the business already records, captures dozens of variants that classic ABC would have had to model as separate activities.

Putting them together

Multiply the time a transaction consumes by the capacity cost rate and you have its cost. Sum across all the transactions a product or customer triggers and you have its total cost. Critically, because you costed the supply of capacity against practical capacity, the minutes actually used will normally be less than the minutes available. The difference, valued at the capacity cost rate, is the cost of unused capacity, reported explicitly rather than smeared into every transaction. That single number, invisible in classic ABC, is one of the method's most valued outputs, and it makes TDABC a natural tool for forecasting resource demand as volumes change.

That is the whole mechanism: two parameters, and the arithmetic between them. If you would rather build it than read it, the TDABC course works through both on your own data, over three to four weeks.

The TDABC formulas

The whole method in five lines, applied to the illustrative distributor in the worked example below.

MeasureFormulaWorked example
Practical capacityTheoretical capacity × about 80 to 85%660,000 × 85% = 561,000 minutes
Capacity cost rateCost of capacity supplied / practical capacityEUR 480,000 / 561,000 = EUR 0.856 a minute
Time equationBase time + an increment for each feature that adds time3.0 + 5.0 (credit clearance) + 2.0 (export) = 10.0 minutes
Cost of a transactionMinutes from the time equation × capacity cost rate10.0 × EUR 0.856 = EUR 8.56
Cost of unused capacity(Practical capacity − minutes used) × capacity cost rate(561,000 − 510,000) × EUR 480,000 / 561,000 = EUR 43,636

Illustrative figures, not client data and not a sector benchmark. The rate is shown rounded to EUR 0.856; totals use the unrounded 480,000 / 561,000.

How to implement TDABC in six steps

  1. Group the resources. Put together the people and equipment that do broadly similar work: order processing, a warehouse shift, a clinic team.
  2. Cost the capacity each group supplies. Salaries, supervision, equipment, space and systems for the period, and nothing already traced directly to a product or customer.
  3. Estimate practical capacity. Paid minutes less breaks, training, meetings and maintenance, typically 80 to 85 per cent of theoretical capacity.
  4. Divide to get the capacity cost rate. The cost of one minute of each group’s capacity.
  5. Write the time equations. A base time per transaction plus a term for each attribute that makes it longer, using fields the ERP or CRM already records, and check the times against observation.
  6. Run the transactions through the model. Sum the cost by order, customer, product and channel, report unused capacity on its own line, and recalculate the rates every month at close.

Every step worked in full, with a model you can follow, is in build a TDABC model.

Video · 2 min 28
The two parameters in 2½ minutes, with the same illustrative distributor and figures as the worked example below. Transcript and key moments. More videos →
A worked example

A worked example

Take an illustrative mid-size B2B distributor (the figures are illustrative, used only to show the mechanics). Consider its order-processing resource group.

ParameterValue (illustrative)
Annual cost of the resource groupEUR 480,000
Practical capacity (about 85% of theoretical)561,000 minutes
Capacity cost rateEUR 0.856 per minute

The capacity cost rate is 480,000 / 561,000 = approximately EUR 0.856 per minute. Now suppose the team's order-handling time follows a simple time equation: a base of 3.0 minutes per order, plus 5.0 minutes if the order needs manual credit clearance, plus 2.0 minutes if it ships to an export destination.

Order typeTime equation (minutes)MinutesCost at EUR 0.856/min
Standard domestic order3.03.0EUR 2.57
Order needing credit clearance3.0 + 5.08.0EUR 6.85
Export order, credit clearance3.0 + 5.0 + 2.010.0EUR 8.56

A customer placing many simple domestic orders is cheap to serve; one whose orders routinely need credit clearance and export handling costs more than three times as much per order, and TDABC quantifies it. If, over the year, the orders processed consume 510,000 of the 561,000 available minutes, the remaining 51,000 minutes are unused capacity, worth 51,000 × EUR 480,000 / 561,000 = EUR 43,636, reported as a line of its own rather than hidden in the per-order cost. That is the visibility classic ABC could not give.

From order cost to customer cost

Now spread the year’s orders across the three types. The time equation turns 99,000 orders into 510,000 minutes, and the cost of the group closes back to the EUR 480,000 we started with.

Order typeOrdersMinutesCost
Standard domestic order60,000180,000EUR 154,011
Order needing credit clearance30,000240,000EUR 205,348
Export order, credit clearance9,00090,000EUR 77,005
Unused capacity - 51,000EUR 43,636
Total99,000561,000EUR 480,000

Two customers show what the minutes change. Customer A places 2,000 standard domestic orders a year. Customer B places 400, all needing credit clearance and half of them shipped for export. A single overhead rate per order, EUR 480,000 / 99,000 = EUR 4.85, charges them by order count and loads the cost of idle time into every order.

CustomerOrdersMinutesTDABC costPer orderCost at single rateDifference
A, simple orders2,0006,000EUR 5,134EUR 2.57EUR 9,697EUR 4,563 over-costed
B, demanding orders4003,600EUR 3,080EUR 7.70EUR 1,939EUR 1,141 under-costed

The single rate says the simple customer costs nearly twice what it really does, and the demanding one less than two-thirds. A price list, a discount policy or a minimum order size built on that view rewards the wrong customer. Illustrative figures, not client data; totals use the unrounded rates.

What it found in a real model

The same arithmetic, run on real transaction data, is what changes decisions. In a TDABC model we built for a mid-size industrial distributor in New Zealand (published with the client’s consent, identity withheld), the first model showed 830 of its 1,951 customers contributing negatively once the cost of serving them was counted, EUR 1.335 million in total. After targeted re-pricing, order consolidation and a sharper product focus, the negative contribution is about EUR 665,000 and the loss-making customers number 295. Read the case study.

+Strengths

The strengths of TDABC are, in large part, the mirror image of ABC's weaknesses, which is precisely why Kaplan and Anderson built it. It is fast and cheap to build and maintain: two parameters per resource group, rather than a cost pool and a survey for every activity, mean a model that can be stood up in weeks and refreshed by updating rates and times rather than re-running a survey programme.

It integrates with existing systems. Because time equations are driven by transaction attributes, order type, customer, channel, service level, the model can be fed directly from the ERP and CRM data a business already captures, rather than from special data-collection exercises. It scales to enterprise size: adding products, customers or variants means extending time equations, not multiplying activities, so the model grows linearly rather than exploding. It captures real-world variety through those same equations, handling the long tail of order and customer types that classic ABC struggled to represent. And it does the two things managers most want: it surfaces unused capacity explicitly, and it supports forecasting of resource demand, because once you know the minutes each transaction takes, you can model what a change in volume or mix will require.

!Weaknesses

The founding sources for TDABC are, by their nature, advocacy: Kaplan and Anderson set out to show what the method can do, and they do not present a list of its shortcomings. The fair criticisms come from the later literature, and they are worth stating plainly.

First, accuracy depends on the quality of the time estimates. The two-parameter design is an advantage only if the times in the equations are right; poor or stale estimates propagate straight through to the costs, and a model can look authoritative while resting on weak inputs. The discipline of validating times against observation matters as much as the elegance of the structure.

Second, critics note that TDABC is harder to apply to non-routine knowledge work. The method is at its strongest where work is repetitive and time is a sensible measure of resource consumption, order processing, warehousing, claims handling, routine clinical pathways. Where the work is creative, variable and judgement-heavy, the time of a task is a poorer guide to its cost, and the equations become strained. Third, and relatedly, the method assumes time is the dominant cost driver. For most operational and transactional work it is, which is why TDABC fits cost-to-serve so well, but where cost is driven by something other than time, the central assumption holds less firmly. These are limits of fit and of input quality, not flaws in the logic, but they should temper any claim that the method is universally applicable.

Where it fits

Where it fits

TDABC is the method most modern profitability work runs on, and its natural home is customer profitability and cost-to-serve: working out what it truly costs to serve each customer, channel and order type once the demands they place on the business are properly counted. It fits wherever there are large transaction volumes of broadly routine work, which is why it has been adopted across logistics and distribution, healthcare, and financial services, alongside manufacturing and B2B distribution more generally. Our own work adds two more to that list: the models we build have included education and public administration.

Industries with high transaction counts and meaningful variety, many customers, many order types, many service levels, are exactly where its time-equation approach earns its keep, and where the unused-capacity output is most actionable. It is the engine beneath cost-to-serve analysis and the whale curve of customer profitability, and it is the natural choice when a model has to stay live, scale with the business, and draw on transactional data rather than periodic surveys. Where the work is non-routine and judgement-heavy, or where time is not the dominant cost driver, its fit is weaker and the time estimates need particular care. When the model has to change decisions across the business, see how we run a cost management engagement.

Limits

The limits: when I would not build a TDABC model

If a business sells a narrow range to a handful of similar customers and overhead is small next to direct cost, a single overhead rate is often good enough (the comparison of activity-based and traditional costing sets out where the line falls), and I would not build TDABC on top of it. The method also needs transactions that repeat: where the work is mostly judgement, a design studio, an advisory team, the minutes per task are a poor guide to what the task costs, and the time equations end up estimated rather than observed. In those cases a simpler model, honestly labelled, beats a sophisticated one nobody can validate.

FAQ

Frequently asked questions

What is time-driven activity-based costing in simple terms?

Time-driven activity-based costing is a simpler version of activity-based costing that works out what products and customers cost using just two pieces of information for each group of resources: how much it costs to supply a minute of capacity, and how many minutes each transaction takes. Multiply the minutes by the cost per minute and you have the cost. Because it counts the cost of supplying capacity against the capacity actually available, it also shows, as a separate figure, how much capacity is going unused.

Who developed TDABC and when?

Time-driven activity-based costing was developed by Robert S. Kaplan and Steven R. Anderson. Anderson had pioneered the time-based approach in his consulting practice, building on capacity-costing ideas in Kaplan and Cooper's 1998 book Cost and Effect. The method was introduced in their Harvard Business Review article in November 2004 and set out in full in their 2007 book Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits.

What are the two parameters in TDABC?

The two parameters are the capacity cost rate and the time equations. The capacity cost rate is the cost of supplying a resource group divided by its practical capacity, usually expressed as a cost per minute, where practical capacity is typically estimated at about 80 to 85 per cent of theoretical capacity. The time equations estimate how many minutes each transaction takes, starting from a base time and adding increments for the features that make a particular transaction take longer.

How does TDABC reveal unused capacity?

TDABC costs the supply of capacity against the practical capacity available, then measures the minutes that work actually consumes through its time equations. Because the minutes used are normally fewer than the minutes available, the difference, valued at the capacity cost rate, is the cost of unused capacity. Classic activity-based costing tended to assume full capacity and roll any idle time into its rates, which hid this figure; TDABC reports it as a line of its own.

Is TDABC better than ABC?

For most modern applications it is more practical: it is faster and cheaper to build and maintain, scales to enterprise size, draws on existing ERP and CRM data, and surfaces unused capacity, which classic ABC hides. It is not a different theory of cost so much as a simpler, more maintainable way to deliver the same insight. The honest caveats are that its accuracy depends on good time estimates and that it fits routine, transaction-heavy work better than non-routine knowledge work. See the full comparison in TDABC vs ABC.

Why does traditional overhead allocation get product and customer costs wrong?

Traditional costing spreads indirect cost with a single broad basis, machine hours, production volume or a percentage of revenue, as though every product and every customer consumed support work in the same proportion. Three distortions follow. Low-volume products are under-costed, because they consume proportionally more setup, quality and engineering effort than the high-volume lines that carry the rate. Complex customers are cross-subsidised by simple ones, because the customer who demands special deliveries, customisations and intensive support appears to cost the same as the standard one. And unused capacity disappears into the rate instead of being reported, which inflates unit costs and hides the decision about what to do with it. TDABC removes all three by costing the supply of capacity against practical capacity and letting the time equations carry the variety. In the models we build, 20 to 40 per cent of products or customers turn out to be unprofitable once cost is traced this way.

What is the TDABC formula?

Two formulas. Capacity cost rate = cost of capacity supplied / practical capacity, usually in minutes. Cost of a transaction = minutes from its time equation × capacity cost rate. In the worked example on this page, 480,000 / 561,000 gives about EUR 0.856 a minute.

How do you estimate practical capacity in TDABC?

Start from the time people or machines are paid to be available and take out breaks, training, meetings and maintenance. Kaplan and Anderson's rule of thumb, in their 2004 Harvard Business Review article, is 80 to 85 per cent of theoretical capacity; the figure is then checked against how the team actually works. Getting it wrong moves every rate, which is why the cost of unused capacity is worth reading line by line.

What are the steps to implement TDABC?

Six steps: group the resources that do similar work; cost the capacity each group supplies; estimate its practical capacity, typically 80 to 85 per cent of theoretical; divide to get a cost per minute; write time equations from the attributes the ERP or CRM already records and check them against observation; then run the transactions through the model, sum the cost by order, customer and product, report unused capacity on its own line and recalculate the rates every month at close.

How do you build a time equation?

Start with the base time of the simplest version of the transaction, then add a term for each attribute that makes it take longer, each switched on by a field the business already records. In the worked example on this page, order handling is 3.0 minutes, plus 5.0 if the order needs credit clearance, plus 2.0 if it ships for export, so an export order needing clearance takes 10.0 minutes. The times come from observation or sampling, not from asking people what share of their week a task takes.

Is TDABC used in healthcare?

Yes, widely. Robert Kaplan and Michael Porter proposed it for healthcare in “How to Solve the Cost Crisis in Health Care” (Harvard Business Review, September 2011): the cost of treating a patient is built from the minutes each clinician, room and piece of equipment spends along the care cycle, multiplied by the capacity cost rate of each. The two parameters are the same; only the transactions change.

Proof

A distributor in New Zealand. €1.335M of cost-to-serve made visible, then halved, and 830 loss-making customers brought down to 295.

Read the case study →

Who you would be talking to

Miguel Guimarães, Founding Partner

Cost and profitability practitioner for 25+ years. Presented the Damco cost-to-serve case at Managing for Profit (Amsterdam RAI, December 2009), on the same programme as Robert S. Kaplan.

Call +351 910 313 731

Workshops

Bring the method into the room.

One working profitability model, built from real data, that you take home at the end.

See upcoming workshops

CONTINUE THE JOURNEY

Next stop

Miguel Guimarães

Reviewed by

Miguel Guimarães

Founding Partner, Cost and Profitability Consulting

Time-Driven ABC engagements since 2010, working within the Kaplan and Anderson framework.

About the author →

Published Updated

M
Ask us anything
usually replies in minutes
Hi. I can answer the quick questions about cost, method and timing right here. For anything specific to your business, I'll connect you with a CostCtrl specialist on WhatsApp.
No bot loops. Straight to a specialist.
Most read
  1. 1Time-driven activity-based costing: ABC made simple and scalable
  2. 2Whale Curve: Definition, How to Build One, Live Simulator
  3. 3Cost-Volume-Profit (CVP) and Break-Even Analysis
  4. 4How to calculate cost to serve, step by step
  5. 5Cost-to-Serve Analysis
  6. 6Make-or-Buy and Relevant Costs
  7. 7TDABC vs ABC: same goal, very different effort
  8. 8Pocket Price Waterfall and Price Realization
  9. 9Transfer Pricing for Internal Profitability
  10. 10Cost-to-Serve, Profitability and AI: Executive Workshop Porto - November 27, 2026