A cost model that is not on the close calendar is not part of the close. It is a project that finance runs when it has time, which after the first quarter means never. The models that survive are the ones whose steps have a day: this loads on the second working day, this reconciles and reprices on the fifth, this publishes on the tenth, and capacity is re-measured once a quarter. This article lays out that calendar, separates what moves every month from what is deliberately held still, and works through one invented cost pool across a close so the mechanics are visible. The pool and every figure are invented and labelled as such; the calendar is what has worked.
What updates in a cost model at D+2, D+5 and D+10 of the month-end close, and what waits for the quarter?
D+2, when the operational systems have closed: the driver quantities and the minutes per cost object are loaded, and a provisional allocation is run at last month’s rates. D+5, when the ledger has closed for costs: each pool’s rate is recomputed as actual cost over practical capacity, the movement is reported as a rate variance split into cost and capacity, and the month is repriced and reconciled to the trial balance. D+10: the reconciliation is signed, the commentary is written from the model’s own variances, and the results are published to the people who decide on them. What waits for the quarter: the practical capacity figures and the time equations, recalibrated with three months of evidence and then frozen. What waits for the year: the pools, the drivers and the perimeter. In the invented picking pool, September’s minutes at August’s rate of 0.62 give a provisional 967,200; on D+5 the rate becomes 0.5953 and the rate variance is 42,000 favourable.
Why a calendar, and not a frequency
The question “how often should we update the model” has a good answer already, in how often to update your cost model: it depends on how fast the cost structure changes and how decision-critical the output is. That sets the cadence. This article is about where each step falls inside the cadence once it is monthly. A model can be updated monthly and still be useless if the update lands on D+14, after the management accounts have gone out, or if the rates move every month unexplained, so that the margin by customer jumps around for reasons nobody can name. The calendar turns a frequency into a process.
The principle: every movement has a name
Everything on the calendar follows from one separation. A time-driven model has two kinds of input: the quantities, which are what happened this month, and the parameters, which are what the model believes about the operation. Quantities are orders, lines, deliveries, minutes, tickets, patients. Parameters are the capacity cost rate of each pool, the practical capacity behind it, and the coefficients of each time equation. The rate is recomputed every month, because its cost half is a monthly fact from the closed ledger. Practical capacity and the time equations hold for a quarter, because a judgement about the operation revised every month makes it impossible to say whether a customer’s cost went up because the customer did something or because the model did. Each movement of the rate is split: so much from cost, so much from capacity.
This is standard costing’s separation of rate and volume, applied to a model otherwise nothing like standard costing. The four TDABC variances depend on it: without a reference rate there is no rate variance, only a number that changed. Here the reference is last month’s rate.
D+2: the operational close
On the second working day the operational systems have closed for the month: the warehouse system has its last picks, the order system its last orders, the service desk its last tickets, the clinic its last consultations. This is the day to load the driver quantities. Nothing in the ledger is needed yet, because the allocation of cost to cost objects uses minutes and rates, and the rates are last month’s, so on D+2 the model can already say, provisionally, what each cost object consumed and what it cost.
The load has three checks that must pass before anyone reads the output. The quantities reconcile to the source system’s own totals. The cost objects are all recognised, so a customer code created mid-month has been mapped and is not sitting in an “unassigned” bucket. And the minutes per pool are within a tolerance of the previous month, so that a feed that silently doubled or halved is caught on D+2 and not on D+10.
In the invented picking pool: the warehouse system closes with 1,560,000 picking minutes for September, computed by the time equation from lines and pallets per order. The pool’s rate, approved at the August close, is 0.62 per minute. The provisional allocated cost is 967,200, spread across customers in proportion to their minutes. Nobody has looked at the ledger.
D+5: the cost close
By the fifth working day the ledger has closed for costs. Now the second half of the model runs. The actual cost of each resource pool replaces the budget or the prior month, the practical capacity on file is confirmed, and the rate is recomputed.
First, the new rate and the rate variance: 1,012,000 over a practical capacity of 1,700,000 minutes is 0.5953, 4 percent below August’s 0.62. At the old rate the same capacity would have cost 1,054,000, so the rate variance is 42,000 favourable, all of it on the cost side because capacity did not move. Second, the month is repriced at 0.5953: the 1,560,000 minutes used are 928,659 allocated to cost objects, and the 140,000 unused are 83,341 of unused capacity, rounded to the unit. Third, the reconciliation: 928,659 plus 83,341 is the ledger’s 1,012,000. Every euro in the pool is on a cost object or in unused capacity.
| Picking pool, September, invented | Minutes | D+2, at 0.62 | D+5, at 0.5953 |
|---|---|---|---|
| Allocated to cost objects | 1,560,000 | 967,200 | 928,659 |
| Unused capacity | 140,000 | 86,800 | 83,341 |
| Practical capacity at the rate | 1,700,000 | 1,054,000 | 1,012,000 |
| Rate variance, favourable | 42,000 |
The mistake on D+5 is to let the new rate in without a name. At 0.5953 every customer’s picking cost falls by 4 percent: right if the pool really was cheaper, wrong if a cost is missing from the ledger and will arrive in October. So the variance is read first: which accounts moved, and why. With a cause and inside the pool’s agreed band, the rate is adopted with its decomposition on record; otherwise a person decides before D+10, the second tier of the rules for an agent recalculating rates.
D+10: reconciliation, commentary and publication
By D+10 the management accounts are being finalised, and the model has to be in them or it is not part of the close. Three things happen. The reconciliation is walked once more, against the final trial balance, to the cent, using the procedure in reconcile a cost model to the ledger, and it is signed by the model owner and by whoever owns the ledger. The commentary is written from the model’s own numbers: the rate variances by pool, the unused capacity by pool, the customers and products whose cost moved most and why, in the language of minutes and rates. And the results are published to the people who decide on them, in the form they decide with: a customer contribution list for the commercial director, a product margin list for the product owners, a capacity utilisation list for operations.
Publication is the step most often skipped, because by D+10 the numbers are “available in the system”. Available is not published. The governance question “who receives what, on what day” is the one to answer before the first close, not after the third.
What waits for the quarter
Two parameters are recalibrated once a quarter, with three months of evidence, and then frozen again. The practical capacity figures: the minutes each pool can actually supply, re-measured against the quarter’s rostered hours, absences and downtime, because capacity drifts and a rate on a stale capacity is wrong in a way that is hard to see. And the time equation coefficients, reviewed against the quarter’s observed times where the operation records them. The rate is not on this list: a real change in the resource’s cost, a pay rise, a rent review, a new machine, enters it on the D+5 of its month, dated. Re-measured capacity enters the next month’s rates, reported apart from the cost movement, because it has a different owner.
The quarterly recalibration is also when the monthly figures are read as a set. Three months of unused capacity in the picking pool, in the invented case 140,000 minutes in September and similar amounts before, is evidence that capacity or staffing should be looked at; one month is not. Recalibrating on a quarter’s evidence rather than a month’s is the difference between a model that tracks the business and one that tracks noise. The monthly drift tests run every month and flag; the quarter is when the flags are acted on.
What waits for the year
The structure. Which pools exist, which drivers they use, which activities the time equations describe, where the perimeter sits. These change when the business changes, a new site, a new channel, a reorganisation, through an annual review that asks whether the model still describes the operation. Changing structure mid-year breaks comparability, and a model whose January cannot be compared with its December has lost half its value. The merge test for cost pools is an annual exercise for exactly this reason.
The calendar on one page
| When | What moves | What it needs | Who signs |
|---|---|---|---|
| D+2 | Driver quantities, minutes per cost object, provisional allocation at last month’s rates | Operational systems closed | Model owner |
| D+5 | Actual pool costs, recomputed rates, rate variances split into cost and capacity, unused capacity, reconciliation to trial balance | Ledger closed for costs | Model owner and ledger owner |
| D+10 | Final reconciliation to the cent, commentary, publication to decision owners | Final trial balance | Finance director |
| Quarter | Practical capacity, time equation coefficients | Three months of actuals and observations | Model owner, with operations |
| Year | Pools, drivers, activities, perimeter | The annual review | Finance director and operations director |
Quantities and rates move every month, each with its reason. Capacity holds for a quarter, structure for a year. A margin that moves should be the business moving, not the model.
Where this goes wrong
The model is run after the management accounts, so its numbers are read as a footnote to a story already told. The rate moves every month with no reason recorded, every customer’s margin wobbles by a few points, and the commercial team stops believing any of it. The D+2 load skips its checks, a feed doubles, and the error is found by the customer whose cost doubled, in a meeting. Or the quarterly recalibration of capacity is never scheduled, the figures set at go-live run for three years, and the model quietly describes a company that no longer exists, which is how the models that fail after go-live most often fail. Each of these is a calendar problem, prevented by writing the day down before the first close.
Where to start
Take the company’s existing close calendar and write the model’s five lines into it: D+2, D+5, D+10, quarter, year, with the owner and the input each needs. Then run one close on the calendar and watch the rate variance appear, split into cost and capacity, for the first time. It will be the first month the model has told you something the ledger could not. The nine steps of a costing close describe which of these can be automated; this calendar is where each sits.