Overhead is charged to products during the year at a rate fixed before the year begins, because nobody can wait until December to know what January’s job cost. That predetermined rate is a forecast divided by a forecast, and at year end the overhead actually incurred and the overhead actually applied rarely match exactly. The difference is called over- or under-absorption, and the mechanics of computing it, splitting it and disposing of it are standard exam material. What is taught less often is that the whole size of the adjustment depends on one choice buried in the denominator, and that changing that choice from budgeted volume to practical capacity is the exact step that turns a traditional absorption system into the capacity-based logic of time-driven costing. This article works one year both ways.

Bottom line

What is under-absorbed overhead, and what changes when the rate is based on practical capacity?

Under-absorbed overhead is the amount by which the overhead applied to products at the predetermined rate falls short of the overhead actually incurred; over-absorption is the reverse. It splits into a spending variance, the difference between what was budgeted and what was spent, and a volume variance, the fixed overhead that went unapplied because activity fell short of the denominator used to set the rate. With budgeted volume as the denominator, in the year below the under-absorption is €33,800 and the volume part is €24,000. With practical capacity as the denominator it is €125,000, of which €115,200 is the cost of capacity that was paid for and not used. The second number is larger and more useful, because it measures something real and stops product costs from rising every time volume falls.

Setting the rate before the year starts

A machining department budgets €480,000 of fixed overhead for the year: supervision, depreciation, rent share, the maintenance contract. Variable overhead, power and consumables, is budgeted at €6.00 per machine hour. The production plan calls for 40,000 machine hours. The department’s practical capacity, what the machines and the shift pattern could deliver with normal maintenance and breaks, is 50,000 hours. Theoretical capacity, three shifts every day of the year, would be higher still, and nobody uses it for anything but a ceiling.

The predetermined rate, on the conventional basis, uses budgeted volume as the denominator. Fixed: €480,000 divided by 40,000 hours is €12.00 per machine hour. Variable: €6.00 per hour. Combined rate: €18.00 per machine hour, and that is what every job is charged from the first of January.

What actually happened

The year came in below plan. Machining worked 38,000 hours, not 40,000. Fixed overhead came in at €486,000, €6,000 over budget, because the maintenance contract was renegotiated upward mid-year. Variable overhead was €231,800, which works out at €6.10 per hour actually worked, ten cents over the budgeted rate on power prices. Actual overhead, all in: €486,000 plus €231,800 is €717,800.

Overhead applied to jobs during the year: 38,000 hours at €18.00 is €684,000. Actual exceeds applied by €717,800 minus €684,000, which is €33,800 under-absorbed. Jobs were charged €33,800 less overhead than the department actually incurred.

Splitting the €33,800

An under-absorption is only useful once it is broken into its causes, because each cause points at a different person.

Fixed spending variance. Actual fixed overhead minus budgeted fixed overhead: €486,000 minus €480,000 is €6,000 adverse. This is the maintenance contract, and it belongs to whoever signed it.

Variable spending variance. Actual variable overhead minus the variable overhead that should have cost for the hours worked: €231,800 minus 38,000 times €6.00, which is €231,800 minus €228,000, so €3,800 adverse. This is the power price.

Volume variance. The fixed overhead that went unapplied because the hours fell short of the denominator: (40,000 minus 38,000) times the fixed rate of €12.00, which is 2,000 times €12.00, so €24,000 adverse. Nobody in the department spent this. It is the arithmetical consequence of dividing €480,000 by 40,000 and then only working 38,000.

Check: €6,000 plus €3,800 plus €24,000 is €33,800, the under-absorption. The largest piece by far is the one that is not a spending problem at all.

The year-end adjustment

The €33,800 has to go somewhere, because the ledger’s overhead control account is sitting with a debit balance that the product accounts have not picked up. Two treatments are standard, and the choice is a materiality judgement.

Write it off to cost of sales. The simple case: cost of goods sold goes up by €33,800, closing inventory is left at the applied rate, and the year’s profit is €33,800 lower than the product costs implied. Most companies do this when the amount is small relative to cost of sales.

Prorate it. When the amount is large, spread it across wherever the applied overhead ended up, in proportion to the applied overhead in each. Say the €684,000 applied during the year sits 10 percent in work in progress, 20 percent in finished goods and 70 percent in cost of sales. Then work in progress takes €3,380, finished goods €6,760 and cost of sales €23,660, which sum to €33,800. Inventory is now valued closer to actual cost, and the profit effect this year is €23,660 rather than €33,800, with the remaining €10,140 flowing through when the inventory is sold. IAS 2 has a view on this, and it is the subject of the next section.

€18.00
per machine hour with budgeted volume as the denominator; €15.60 with practical capacity
€24,000
volume variance on the budgeted-volume basis, for a 2,000 hour shortfall
€115,200
cost of unused capacity on the practical-capacity basis, for a 12,000 hour shortfall

The same year on practical capacity

Now change nothing except the denominator. Fixed rate: €480,000 divided by 50,000 hours of practical capacity is €9.60 per machine hour. Combined rate with the €6.00 variable: €15.60. Applied during the year: 38,000 hours at €15.60 is €592,800. Actual overhead is unchanged at €717,800. Under-absorbed: €717,800 minus €592,800 is €125,000.

Split it the same way. Fixed spending variance: still €6,000 adverse. Variable spending variance: still €3,800 adverse. Those two do not depend on the denominator. Volume variance, now better called the cost of unused capacity: (50,000 minus 38,000) times €9.60, which is 12,000 times €9.60, so €115,200. Check: €6,000 plus €3,800 plus €115,200 is €125,000.

Three things have changed and one has not. Product cost per hour has fallen from €18.00 to €15.60, because each job now carries only the fixed cost of the capacity it used, not a share of the capacity that was planned but idle. The year-end adjustment has grown from €33,800 to €125,000, and the part of it that is not a spending variance now has a plain meaning: the department paid €480,000 for 50,000 hours and used 38,000 of them, so €115,200 bought hours nobody consumed. And that €115,200 no longer goes into inventory under any proration; it is reported as a period cost with its own line, which is what IAS 2 requires when production is abnormally low and what a management report should show regardless. What has not changed is the total overhead, €717,800, because the denominator moves the cost around and cannot alter how much there was.

The reason to prefer the second basis is not the size of the adjustment; it is what the first basis does to next year’s rate. Under budgeted volume, a plant that budgets 36,000 hours next year because this year was slow will set a fixed rate of €480,000 over 36,000, which is €13.33 per hour. Products get dearer on the cost card, prices are pushed up to hold margin, volume falls a little further, and the year after the rate is higher again. Every management accounting course names this the death spiral, and it is driven entirely by the choice of denominator. Under practical capacity the fixed rate stays at €9.60 until the capacity itself changes, product costs stop moving with the order book, and the cost of empty hours appears where a manager can act on it.

Budgeted volume makes products pay for the hours you expected to sell. Practical capacity makes products pay for the hours they used and shows you the rest. The under-absorption gets bigger and the product cost gets more honest at the same time.

Why this is the bridge to time-driven ABC

Strip time-driven activity-based costing down to its first equation and it is the second calculation above, generalised. The capacity cost rate is the cost of the resources supplied divided by their practical capacity, in minutes rather than machine hours: €480,000 of fixed cost over 50,000 hours, or 3,000,000 minutes, is €0.16 per minute, and a job that took 90 minutes of the department is charged €14.40 of fixed overhead, whatever the rest of the year looked like. Every activity, every product and every customer is costed at that rate, and the minutes not consumed by anything, multiplied by the rate, are reported as the cost of unused capacity. The €115,200 in this example is that line for a single department.

What TDABC adds is the time equation, which replaces “38,000 machine hours” with the minutes each order actually took given its characteristics, so the capacity line can be read by product, by customer and by activity rather than as one departmental total. But the discipline that makes it work is the one the absorption exercise teaches: fix the rate on what the resource can do, charge products for what they use, and do not let idle capacity hide inside a unit cost. A student who can compute the €125,000 and explain why it is larger and better than the €33,800 has already understood the half of TDABC that matters most.

Related reading: practical capacity, capacity cost rate and cost of unused capacity in the glossary, capacity costing, IAS 2, normal capacity and inventory cost, marginal versus absorption costing and time-driven activity-based costing.