A cost model that does not reconcile to the general ledger is an opinion with decimals. I say that with some sympathy, because early in my career I built models that did not reconcile, and the question that follows is always the same one: why do the customer margins add up to less than the operating result, and which of the two numbers do we believe? Every model we deliver now ties to the ledger to the cent before anyone sees a ranking, and the procedure has settled into seven steps. What surprised me is that the hard part is not the arithmetic. It is agreeing which differences are errors and which are the model doing its job.
What does it mean to reconcile a cost model to the general ledger to the cent?
It means that every euro in the trial balance for the period is accounted for by the model in exactly one place: allocated to a cost object, held as unused capacity, or listed as deliberately excluded with a reason. The total of those three equals the ledger with zero difference. It does not mean every allocation is exact; it means nothing is missing, nothing is double counted, and every difference has a name and an owner.
Why to the cent, and not to within one percent
A tolerance sounds reasonable and it is how most models start. The problem is that a one percent tolerance on a ten million euro cost base is 100,000 euros of unexplained cost, which is more than the entire margin of the customers at the tail of most whale curves. Worse, a tolerance hides the shape of the difference. A difference of 7,184.68 euros that traces to one cost centre and one account is a mapping error you fix in five minutes. The same amount spread thinly across forty accounts is usually a timing difference and belongs on the list of things you do not chase. You only learn which it is by driving the difference to zero and reading what was left on the way.
So the standard is zero, and the price of the standard is that the list of legitimate differences has to be written down. Most of this article is that list.
Step 1: fix the perimeter before touching a number
Decide, and write in the model’s own documentation, four things: the period (a closed one, after period-end allocations, accruals and settlements have posted), the legal entities included, the currency and the exchange rate basis, and the exact trial balance you are reconciling to, with its extraction date. A trial balance extracted on the 4th of the month and one extracted on the 12th are different documents, and a model that reconciled to the first will not reconcile to the second if late postings arrived in between. Keep a copy of the trial balance with the model. This step takes an hour and saves weeks.
Step 2: map every account, with no “other”
Every G/L account in the range you have chosen gets exactly one of three treatments: it goes into a resource pool, it is excluded with a written reason, or it is a memo account carried for information. The mapping is by account, not by cost centre, because cost centres move between departments and accounts do not. Two disciplines matter here. There is no “other” or “miscellaneous” treatment; an account you cannot place is an account you do not yet understand, and the question goes to the accountant who owns it. And the mapping records the sign convention, because a credit balance on an expense account (a rebate received, a reversal) is the most common reason a pool total looks wrong by an amount nobody can find.
Step 3: reconcile the resource pools to the trial balance
Sum the pools. Add the excluded accounts. The total must equal the trial balance for the range, to the cent. It usually does not on the first pass, and the differences fall into a small number of shapes: an account left out of the mapping (the total is short by a round-looking amount), an account mapped twice (long by the same), a cost centre reassigned mid-period, or a sign error. Fix them in the mapping, not in the model, so that the fix survives next period’s refresh.
| Line | Amount (illustrative) | Note |
|---|---|---|
| Trial balance, accounts 60 to 69, entity A, Q2 | 4,812,336.17 | Extracted 8 July, kept with the model |
| Resource pools (11 pools) | 4,406,120.44 | Sum of the pool sheet |
| Excluded: income tax, financial result, extraordinary | 391,004.90 | Listed by account, reason on each |
| Excluded: intercompany recharge out | 15,210.83 | Eliminated at group level |
| Difference | 0.00 | Signed off |
The figures above are made up for the arithmetic and are not from any client. The shape is the real thing: the difference line reads 0.00 and every excluded amount has its own row.
Step 4: reconcile capacity supplied to capacity used
This is the step that makes a time-driven model different from a classic allocation. Each resource pool has a cost and a practical capacity in minutes. The model allocates cost to cost objects at the rate of cost per minute of practical capacity, and whatever minutes the transactions did not consume are unused capacity. So for each pool: pool cost equals allocated cost plus unused capacity cost, to the cent. If a pool shows unused capacity of minus 40,000 euros, the time equations demand more minutes than the department has, and either the unit times are too generous or the capacity is understated. Both are findings. Neither is a reconciliation error, and the reconciliation is what surfaced them. We wrote about the range to expect in capacity utilisation in TDABC; somewhere around 80 to 90 percent used is common in service departments, and a first model that lands far outside that band has a capacity problem before it has an allocation problem.
Step 5: reconcile allocated cost to the cost objects
Sum the cost allocated across all customers, products or channels. It must equal the allocated total from step 4. The gap, when there is one, is the unassigned bucket: transactions with no customer number, order lines whose product has no master data, activities with no time equation matched. A small unassigned bucket is normal on the first build; a large one is a data problem to fix upstream, described in the cost model data extract. What you must not do is spread the unassigned bucket across everyone in proportion to revenue. That reintroduces the averaging the model was built to remove, and it does so silently.
Step 6: reconcile revenue and direct cost
Revenue in the model comes from invoice lines; revenue in the ledger comes from the revenue accounts. They differ, and most of the difference is legitimate: credit notes posted in aggregate, year-end rebates accrued as one journal, deferred revenue, currency revaluation, and cut-off (an invoice dated the 30th and posted on the 2nd). Direct cost has its own version: cost of goods sold at standard in the sales documents versus actual in the ledger, with the variance posted separately. The reconciliation here is a bridge, not a zero: invoice-line revenue, plus or minus each named item, equals ledger revenue. Each item on the bridge is a line the model either carries at the total level (a rebate accrual that belongs to no invoice) or deliberately leaves out. What the bridge cannot contain is a plug.
Step 7: sign off and freeze
Write the reconciliation statement: the trial balance reference, the pool total, the excluded accounts, the unused capacity by pool, the unassigned bucket, the revenue bridge, and the difference of 0.00 at each level. Someone in finance who did not build the model signs it. Then version the model, because a model that reconciles today and is edited tomorrow reconciles to nothing. The frequency of the next refresh is a separate decision, covered in how often to update a cost model, but the rule is that every refresh repeats steps 3 to 7 before anyone sees a result.
The differences you should not chase
This is the list I wish someone had given me twenty years ago. Each of these is a difference between the model and a naive reading of the ledger, and each is the model doing what it is supposed to do.
- Unused capacity. The model allocates at practical capacity, so idle minutes stay as a cost of the period, not of the customers. A controller who tries to “fix” the model until customers absorb all of it has rebuilt a full absorption model and lost the one number that tells management where the slack is. The reasoning is in the cost of unused capacity.
- Accounts deliberately excluded. Income tax, financial income and expense, extraordinary items, and usually depreciation on assets outside the scope of the model. They are excluded because allocating them to a customer would say nothing about that customer. They appear on the reconciliation by name, with the amount, every period.
- Timing differences at the cut-off. Billing date versus posting date, accruals reversed next period, invoices in transit. On a closed quarter they are small; they are never zero; they are listed on the revenue bridge and left alone.
- Aggregate postings with no transaction behind them. Year-end rebates, bonus provisions, warranty accruals, restructuring charges. The model carries them at the level where they were posted (the customer, the product family, or the total) and does not invent invoice lines to spread them.
- Currency revaluation. Unrealised gains and losses on open items are ledger movements, not costs of serving anyone.
- Rounding residue. Allocating 480,000 euros across 21,000 order lines at a rate with four decimals produces a total a few cents off. The rule is deterministic: the residue goes to the largest line, or to a named rounding row, and the statement says which. A few cents chased for an afternoon is an afternoon lost.
- Simplifications declared in step 1. A pool treated as a period cost because the driver data does not exist yet, a department left out of the pilot. Declared up front, they are scope; discovered later, they are errors. The difference is only when they were written down.
A difference with a name is a reconciling item. A difference without one is a defect, whatever its size.
What this looks like in practice
On a first build, steps 1 to 3 take a few days, mostly spent with the accountant who knows why account 6229 exists. Steps 4 and 5 are where the model’s own problems show up, and they usually take a week of back and forth with the department. Step 6 is an afternoon if the invoice extract is good and a week if it is not. Step 7 is an hour and it is the step most often skipped. After the first period, the whole cycle is a day, because the mapping is stable and the list of legitimate differences is known. If you would rather test the state of your current model against these seven steps before rebuilding anything, the reconciliation statement of step 7 is a good place to start: if you cannot produce one from what you have, that is the finding.
Related reading: why a fast model needs slow validation, costing the capacity you never use and standard costing versus actual costing.
