Every introduction to time-driven costing carries the same sentence: practical capacity is usually around 80 to 85 percent of theoretical capacity. We use it on this site, Kaplan and Anderson used it in the book, and as a first approximation for an office team it is a reasonable place to start. Where it goes wrong is when it gets applied uniformly to a warehouse crew, a nursing ward, an engineering team and an accounts payable desk, as if the minutes lost to breaks, handovers, training and absence were the same in all four. They are not, and the differences are large enough to move a capacity cost rate by a fifth or more, which is enough to move the answer on which customers and services pay their way. What follows are the ranges I have seen by function, offered as patterns from models we have built, not as a study. We have published zero formal benchmarks on this, and I want to be clear about that before giving any number.

At a glance

Is practical capacity always 80 to 85 percent of theoretical capacity?

No. The 80 to 85 percent rule of thumb is a reasonable default for office work, but the realistic share of paid time that a resource can actually supply varies by function, because the unavoidable losses differ: breaks and congestion in a warehouse, handovers and mandatory training and absence on a ward, meetings and switching in engineering. As illustrative patterns from models we have built, warehouse operations tend to land somewhere in the low-to-mid 70s to low 80s, nursing often in the 60s to low 70s of rostered hours, engineering anywhere from the mid 50s to the mid 80s depending on what counts as an activity, and back-office in the high 70s to high 80s. The base matters as much as the percentage: 80 percent of rostered hours and 80 percent of paid hours are different numbers.

What the textbook range actually assumes

The 80 to 85 percent figure is not arbitrary. It comes from a simple decomposition of a working day for someone at a desk: take the paid hours, subtract breaks, a little for arriving and leaving, some training and meetings, and a normal allowance for holiday and sickness if the base is annual paid time, and you land in that band. The capacity costing page walks through the arithmetic. The rule is good enough for a first model of a back-office team, and I would not spend a week refining it before the model has produced its first whale curve; the difference between 80 and 85 percent moves the rate by about 6 percent, which is usually smaller than the error in the time estimates themselves.

What the rule does not do is survive contact with functions whose unavoidable losses look nothing like an office. Three things vary by function and each of them can move the number by ten points or more: what the base is, which losses are structural rather than discretionary, and how much of the lost time is really an activity in disguise. The glossary entry gives the definition; the rest of this article is about those three things.

The base is half the answer

Before comparing percentages, agree what they are percentages of. Theoretical capacity can mean paid hours, rostered hours, or hours physically present, and the same team gives three different practical capacities depending on the choice. If the base is annual paid hours, holiday and sickness come out of it and the percentage is lower; if the base is rostered shift hours, they were not in it and the percentage is higher. A nursing ward at 70 percent of rostered hours and an engineering team at 70 percent of paid hours are not at the same utilisation, and a model that mixes the two bases will tell you they are. In the models we build, the base is whatever the cost in the resource pool actually pays for, which is usually paid hours for salaried staff and rostered hours where the cost is built from shifts, and the choice is written into the model’s documentation so that the percentages can be compared later. The capacity cost rate article shows how the base flows into the rate.

Warehouse operations

A picking and packing crew has short, fixed breaks, a start-of-shift briefing, safety and equipment checks, and, above all, congestion and waiting: waves that have not been released, a forklift that is busy, an aisle blocked by a replenishment pallet. Some of that waiting is structural and some is the operation’s own scheduling, and a model has to decide which to treat as lost capacity and which to treat as an activity called “waiting” that can be reduced. The illustrative pattern I have seen, on a base of rostered shift hours, is practical capacity in the region of 72 to 82 percent, with the lower end in sites that run waves and have a lot of mechanised handling and the upper end in simpler manual operations with steady flow. The bigger issue in warehouses is not the annual percentage but the seasonal one: a site that runs at 95 percent of practical capacity in the eight weeks before Christmas and 55 percent in February has an annual average that describes neither. We usually model capacity by month or by season for that reason, and the logistics TDABC page shows how the peaks change the cost per order line.

Nursing and clinical staff

A ward is the function where the textbook rule is furthest from what a model finds, and the reason is structural. Every shift has a handover at each end, mandatory training is a regulatory requirement rather than a choice, and unscheduled absence in nursing runs higher than in most office functions for reasons everyone in healthcare knows. If those come out of capacity, and on a rostered-hours base I think they should, the pattern we have seen sits somewhere in the 60 to 72 percent range of rostered hours available for patient-related activity. That is a wide band and the position within it depends heavily on how the hospital handles cover for absence: a ward that backfills with agency staff has a higher practical capacity in its own headcount and a higher cost in the pool; one that does not has a lower practical capacity and staff running hot.

The judgement call that matters most on a ward is documentation. Charting, orders and discharge paperwork can take a large share of a nurse’s shift, and it is tempting to treat it as lost time. It is not; it is an activity, consumed by a patient, and in a TDABC model it belongs in the time equation for the episode of care. The moment it is treated as capacity loss, the cost of every direct-care minute rises and the model starts telling the hospital that bedside care is expensive when what is expensive is the paperwork around it. The healthcare capacity page and the cycle of care article go through that distinction in detail, and the dialysis unit case study shows what it did to the cost per session.

Engineering and other knowledge work

Engineering is where the range is widest, and almost all of the width comes from the third question: what counts as an activity. An engineer’s week contains design work, reviews, meetings, estimating, support to production or to customers, and a good deal of switching between all of those. If the model treats meetings and reviews as activities with their own time equations, which they are when a customer or a project can be named as the consumer, practical capacity looks like an office and lands around 80 to 85 percent of paid hours. If the model treats everything that is not billable or assignable design work as lost capacity, which is how many engineering managers instinctively think about it, the same team reports something closer to 55 to 70 percent. Both numbers are correct descriptions of the same week under different definitions, and the mistake is to compare a team measured one way with a team measured the other.

My preference, for what it is worth, is the first definition, because it keeps the cost of meetings visible as a cost of the projects that called them rather than hiding it in a lower capacity that inflates the rate for everything. The professional services article makes the same argument for lawyers and consultants, where the “billable” habit produces the same distortion, and the IT and digital services page covers the software version of it.

Back office and shared services

Accounts payable, payroll, order entry, customer service: these are the functions the textbook rule was written for, and here it mostly holds. Breaks are fixed, meetings are few, training is modest, and the work arrives steadily enough that congestion is rare. The pattern we have seen, on a base of paid hours, is roughly 78 to 88 percent, which brackets the textbook figure comfortably. The one thing that moves a back-office team outside that band is a system: a month-end close that freezes the ledger for two days, a portal outage, a batch job that runs at the wrong time. Those are capacity losses when they are structural and activities when the team can influence them, and the answer is usually to model the recurring ones explicitly. The shared services TDABC page gives the standard time equations for the common processes.

The ranges side by side

Illustrative only, from models we have built, with the base stated because it changes the comparison. No formal benchmark has been published by us and these should not be quoted as one.

Function Base Illustrative practical capacity What drives the spread
Textbook default Paid or rostered hours 80 to 85% Breaks, training, normal absence
Warehouse operations Rostered shift hours 72 to 82% Wave scheduling, congestion, equipment waits; seasonality dominates the annual figure
Nursing and clinical Rostered hours 60 to 72% Handovers, mandatory training, absence and how it is covered; documentation is an activity, not a loss
Engineering and knowledge work Paid hours 55 to 70%, or 80 to 85% if meetings and reviews are modelled as activities The definition of an activity, more than anything in the work itself
Back office and shared services Paid hours 78 to 88% System freezes and month-end; otherwise the textbook holds

Why the spread matters for the answer

A capacity cost rate is cost divided by practical minutes, so a ten-point difference in the percentage is roughly a 12 to 15 percent difference in the rate, and the rate multiplies every minute in every time equation. Put a ward at 82 percent when it is really at 66 and every episode of care is undercosted by about a fifth, with the missing cost quietly reappearing as an unexplained gap between the model and the ledger. Put an engineering team at 60 percent when its meetings are already in the time equations and every project is overcosted by about a third, and the model will recommend outsourcing work that was cheaper in-house. Neither error produces a warning; both produce a confident number. The variance analysis article shows what an unused capacity variance looks like when the standard is right, and the capacity calculator lets you try the arithmetic on your own team’s hours.

The practical advice, then, is not to look up a number for your function but to build it: list the losses, decide for each one whether it is structural or an activity someone consumed, state the base, and write the answer down next to the rate so that whoever reads the model in a year can see why the ward is at 66 and the accounts desk at 84. Sometimes that exercise lands on 82 percent for everyone and the textbook was right. More often it does not, and the differences are where the model earns its keep.

The textbook says 80 to 85 percent. A ward, a warehouse and a design office each have their own number, and the base you measure it against is half of it.

Related reading: the cost of unused capacity, capacity utilisation in TDABC, measuring activity times without surveillance and capacity and OEE in manufacturing.