Every time-driven costing model needs one number per activity that nobody has: how many minutes it takes. The moment you go and get that number, the people who do the work have a reasonable question, which is what it will be used for. If the honest answer is “to cost the activity, not to rate you”, the measurement method should make that answer visibly true, and in Europe the law leans the same way. This article is about the methods that get a usable number without anyone feeling watched, and about what the GDPR and Portuguese labour law actually allow when time at work is being measured. I am an engineer, not a lawyer, and the legal part is written to tell you where the lines are, not to tell you that your project is on the right side of them.
How do you measure activity times for TDABC without monitoring individual employees?
A time-driven model needs the time per unit of activity for a department, not the time per person. Structured estimation by the team, a consensus workshop with ranges, work sampling that records activity states rather than names, and aggregate timestamps the systems already hold will give that number to within the precision the model needs. Individual timing dashboards, keystroke or screen monitoring and any use of the data for appraisal are neither necessary for the model nor, in most European settings, lawful without a specific basis. Measure the activity, aggregate by design, and say so in writing before you start.
What the model actually needs, which is less than people fear
The unit of a time equation is the activity, and the granularity is the department. “Processing a standard order takes about eight minutes, plus two per additional line, plus five if it is international” is a statement about the order desk, not about Ana or Pedro. The model then multiplies those minutes by the volumes and compares the total with the department’s practical capacity. At no point does it need to know that Ana processed 312 orders and Pedro 280, and a model that carries that information carries a liability it cannot use. This matters because the legal exposure and the human resistance both come from measuring people, and the model does not require it. If a method produces individual data as a by-product, the first design decision is to throw that by-product away before it is stored.
It also helps to be honest about precision. A time-driven model on a department with 40,000 transactions a year does not change its ranking of customers if the base time is eight minutes or nine. It changes materially if the increment for an international order is two minutes or fifteen. So the estimation effort belongs on the terms of the equation that vary across cost objects, and the base time can be rough; that is where most of the anxiety about “exact” measurement can be safely dropped.
Method 1: structured estimation by the people who do the work
This is the method Kaplan and Anderson described when they introduced the time-driven approach, and it is still the one I use first. You sit with three to five people from the department, one activity at a time, and ask two questions: how long does a standard one take, and what makes it take longer. The answers come as ranges, and the range is the useful part. “Six to ten minutes, fifteen if the customer is new” is a time equation waiting to be written; “eight minutes” is a guess dressed as a fact. Ninety minutes covers five to ten activities. The people are named nowhere in the model; the department’s estimate is the department’s estimate.
The limit of the method is optimism. Experienced people describe the clean case and forget the twenty percent of transactions that go wrong, so the estimates tend to run low. The check is in the capacity: if the equations consume 50 percent of practical capacity, the estimates are missing the messy cases, and the workshop is repeated with the question “what happened on the worst order last month”. More on that check in capacity utilisation in TDABC.
Method 2: the consensus workshop with ranges
A variant for larger or more political departments: each participant writes their estimate for each activity privately, the estimates are shown as a spread without names, the outliers explain themselves, and a second round narrows the range. It borrows from the Delphi method and it works for the same reason: the loudest person no longer sets the number, and the people whose estimates were far from the group learn something about their own view of the work. It takes twice as long as method 1 and produces estimates the department will defend, because the department made them.
Method 3: work sampling, recording states rather than people
Work sampling is an old industrial engineering technique and it suits offices better than people expect. At random moments over two or three weeks, an observer (or the team members themselves, on a rota) records what activity is being performed at that instant across the department: “order entry”, “customer call”, “returns”, “meeting”, “idle”. Not who is doing it; what is being done. With enough observations the proportion of time per activity is known to a usable precision, and dividing the department’s capacity by the volumes gives the average time per unit.
The arithmetic for the number of observations is standard. For an activity that takes roughly 30 percent of the time, and a precision of plus or minus five percentage points at 95 percent confidence, you need about 320 observations; for plus or minus three points, roughly 900. Spread over fifteen working days that is a few dozen moments a day, which is a small burden. The method’s strength is that it measures the messy cases the estimation workshop forgets, because it catches them in the act. Its weakness is that it measures proportions, not increments, so it validates the base times and the capacity split but does not tell you that an international order costs five minutes more. Use it to check method 1, not to replace it.
Two design rules keep it clean. The observation sheet has no names and no seats, only activity states and counts. And the moments are genuinely random, published in advance as a method but not as a schedule, so that nobody is “observed” and nobody rehearses.
Method 4: direct timing of a small number of transactions, with volunteers
Sometimes one term of an equation matters enough to measure directly: how long a credit note dispute really takes, or a complex configuration. The honest way is to ask for volunteers, time ten to twenty transactions, record the elapsed minutes against the transaction’s characteristics (lines, country, changes) and not against the person, and share the result with the volunteers first. Twenty timings give a median and a spread, which is all a time equation needs. Timing everyone for a month gives the same median, a mountain of personal data, and a department that stops talking to you.
Method 5: timestamps the systems already hold
Order systems, ticketing tools, warehouse scanners and workflow engines record when things happened: created, released, picked, closed. Those timestamps are already collected for operational reasons, and used in aggregate they are a good source for validating unit times and for finding the steps that consume the most elapsed time. Two cautions. Elapsed time is not effort time: a ticket open for three days had perhaps twenty minutes of work in it, and a model that uses elapsed time as effort will charge the customer for the queue. And using data collected for one purpose (running the operation) for another (measuring time per activity) is a change of purpose that, under the GDPR, has to be compatible with the original one and be explained to the people concerned. Aggregate statistics by activity generally pass that test; per-person productivity dashboards generally do not, and I come back to that below.
The check that does not need any measurement at all
Whatever method you used, the capacity back-solve is the test. Practical capacity of the department in minutes for the period, divided among the activities by the estimated times and the actual volumes, should land somewhere around 80 to 90 percent used in most service departments. Well above 100 percent means the estimates are too generous or a volume was counted twice; well below 60 means the estimates are missing the difficult cases or the pool includes people doing something else. This check uses the ledger, the headcount and the transaction counts, and no observation of anyone. It is also the argument that ends most debates about precision: if the estimates reconcile to capacity, the model is good enough to rank cost objects, and if they do not, more measurement of individuals would not fix it.
Where the law is, as far as I can read it
The following is my understanding of the rules that apply in Portugal and in the European Union, written for a finance reader who needs to know where the lines are. It is not legal advice, the details change, and any real project involving measurement of time at work should be checked with a lawyer or a data protection officer for your specific situation.
The GDPR applies to data about identifiable people, and not to aggregates. A time per activity for a department is not personal data. A time per person is. So the principle of data minimisation in Article 5 is not an obstacle to a time-driven model; it is a description of how to build one. The related principles, purpose limitation and transparency, mean that if you do collect anything about individuals along the way, you say what for, you use it only for that, and you keep it no longer than needed.
Consent is a weak basis in employment. The European data protection authorities have said for years, in the Article 29 Working Party’s opinion on data processing at work in 2017 and in the European Data Protection Board’s guidance since, that an employee’s consent is rarely freely given because of the imbalance between the two sides. The basis employers usually rely on for measurement is legitimate interest under Article 6(1)(f), which requires a balancing test: the interest in knowing what activities cost, weighed against the intrusion, with the least intrusive method chosen. Aggregate estimation and work sampling of activity states score well on that test; individual monitoring scores badly, and the more it looks like performance control the worse it scores.
Systematic monitoring triggers an impact assessment. Article 35 requires a data protection impact assessment where processing is likely to result in a high risk, and systematic monitoring of employees is one of the examples the authorities give. A department-level time study built on the methods above is, in my reading, usually not systematic monitoring of individuals, but if you find yourself collecting per-person timings continuously, you are in the territory where a DPIA is expected and the DPO should be in the room.
Article 88 hands part of the question to national labour law. The GDPR explicitly allows member states to set more specific rules for the employment context, and Portugal has. The Portuguese Labour Code (Código do Trabalho), in Article 20, prohibits the use of remote surveillance technology in the workplace for the purpose of controlling workers’ professional performance; it permits such technology for the protection of people and property, or where the nature of the activity specifically requires it, and Article 21 attaches information duties to any lawful use. Article 22 protects the confidentiality of personal messages and access to information of a non-professional nature. Law 58/2019, which implemented the GDPR in Portugal, ties the treatment of data from remote surveillance back to those Labour Code provisions. The practical reading for our purpose is direct: cameras, screen capture, keystroke logging or software that times each person’s work cannot be justified as “input for a cost model”, because the cost model does not need them and the Labour Code treats performance control by technological means as the thing to avoid, not as an incidental use.
Worker representatives, where they exist, expect to be informed. Works councils and union delegates in Portugal have information and consultation rights on matters that affect working conditions, and a time study is one. In practice the projects that went smoothly were the ones where the method was presented to the team and, where there was one, to the representative structure, before the first workshop. That is also simply good manners.
The wider EU direction. The 2024 directive on platform work introduced rules on algorithmic management, including limits on what automated systems may collect about workers, for the platform sector. It does not apply to an order desk, but it shows where the regulators are looking, and a method that would be uncomfortable under those rules is a method worth avoiding elsewhere too.
Five practices that keep the team on side
Say what the number is for, in writing, before the first workshop, and say what it will not be used for. Put the department’s own people in the estimation workshop and let them see the equations. Aggregate by design: no names in any sheet, no per-person outputs stored, and the observation sheets destroyed once the proportions are computed. Share the results with the department before finance sees them, including the unused capacity number, which is usually the one they fear and the one that most often works in their favour, because it shows that the department is fuller than the organisation assumed. And keep the promise: a model whose numbers are later quoted in an appraisal will not be updated by anyone, ever again, and the model dies with the trust.
The model measures the activity. If a method measures the person instead, it is producing data the model cannot use and the law does not want you to hold.
Related reading: the time equation reference, the cost driver library: what actually moves the minutes, time-driven activity-based costing worked out in full and, for what we ourselves collect on this site, our privacy policy.