Activity-based costing is a two-stage calculation, and most exercises only show the second stage. Costs appear already sitting in activity pools, the student divides by a driver and multiplies out, and the lesson that the pools themselves came from somewhere, through resource drivers that are measurements or opinions, is skipped. The other thing that is usually skipped is the comparison. ABC is not interesting on its own; it is interesting next to the number the company already had, which is the same total spread by labour hours, machine hours, units or revenue. Here are twenty original exercises, each carrying both stages, each solved in full, and each set against the volume-based allocation of the same data so that the distortion is a number on the page rather than a claim in a paragraph.

Bottom line

What does a two-stage ABC exercise look like, and what does the volume-based comparison show?

Stage one takes the resource costs from the ledger (indirect labour, equipment, space) and assigns them to activities (setups, inspection, order handling) using resource drivers: the share of each resource each activity consumes. Stage two divides each activity pool by its driver quantity to get a rate per setup, per inspection, per order, and charges each product for the driver quantities it caused. The volume-based alternative divides the same total by one base, usually labour hours, machine hours, units or revenue. The two agree only when every product consumes every activity in the same proportion as it consumes the base. In the twenty exercises below that happens once, by design, in Exercise 5. Everywhere else the low-volume, high-complexity product is under-costed by the volume rate, often by a factor of two to four and never by less than 13 percent, and the high-volume product pays the difference.

How to read each exercise

Every exercise has the same shape. A short setting. A first table with the resources, their cost, and the percentage of each resource consumed by each activity (the resource drivers). A second table with the activity driver quantities per product and the volume base the company currently uses. Then the solution in four steps: stage one, stage two, the ABC cost per product, and the volume-based allocation, followed by a comparison table. Two checks are built in and you should make them on your own working: the activity pools must add to the total indirect cost, and the ABC product costs must add to it again. If either fails, a percentage row does not sum to 100 or a driver was applied to the wrong pool.

The percentages in the first table are the part of ABC that textbooks treat as given and practitioners spend most of their time on. In Exercise 16 they are derived from headcount and floor space rather than asserted, which is what a good model does wherever it can. Everywhere else, take them as the result of interviews with the people involved, and remember that they are the softest numbers in the model.

The twenty exercises

Exercise 1. Two products, one machine shop. A machine shop makes a standard bracket (S) and a custom bracket (C). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Machine setups Machining
Indirect labour €180,000 50% 50%
Machine running costs €120,000 10% 90%
Total €300,000
Activity driver standard bracket custom bracket Total
Machine setups (setups) 20 80 100
Machining (machine hours) 8,000 2,000 10,000
Volume base: machine hours 8,000 2,000 10,000

Stage one, resources to activities. Machine setups: 50% of €180,000 plus 10% of €120,000, which is €90,000 plus €12,000, so €102,000; Machining: 50% of €180,000 plus 90% of €120,000, which is €90,000 plus €108,000, so €198,000. The two pools add to €300,000, the total indirect cost, which is the first check.

Stage two, activity rates. Machine setups, €102,000 over 100 setups, €1,020 per setup; Machining, €198,000 over 10,000 machine hours, €19.80 per machine hour.

ABC cost per product. Standard bracket: 20 times €1,020 plus 8,000 times €19.80, which is €20,400 plus €158,400, so €178,800; Custom bracket: 80 times €1,020 plus 2,000 times €19.80, which is €81,600 plus €39,600, so €121,200. Sum €300,000, the second check.

Volume-based allocation. One rate: €300,000 over 10,000 machine hours is €30 per unit of the base; standard bracket 8,000 times €30 is €240,000; custom bracket 2,000 times €30 is €60,000.

Indirect cost standard bracket custom bracket
ABC, two-stage €178,800 €121,200
Volume-based (machine hours) €240,000 €60,000
ABC minus volume-based -€61,200 +€61,200
ABC as a multiple of volume-based 0.74 2.02

What to notice. The custom bracket runs a fifth of the hours and four fifths of the setups.

Exercise 2. A bakery with three lines. A bakery makes bread (B), pastries (P) and celebration cakes (K). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Recipe changeovers Baking Packing
Bakers’ indirect time €100,000 60% 20% 20%
Ovens and energy €60,000 20% 80% 0%
Packaging labour €32,000 0% 0% 100%
Total €192,000
Activity driver bread pastries cakes Total
Recipe changeovers (changeovers) 50 250 300 600
Baking (oven hours) 3,000 1,500 500 5,000
Packing (unit packeds) 200,000 100,000 20,000 320,000
Volume base: units produced 200,000 100,000 20,000 320,000

Stage one, resources to activities. Recipe changeovers: 60% of €100,000 plus 20% of €60,000, which is €60,000 plus €12,000, so €72,000; Baking: 20% of €100,000 plus 80% of €60,000, which is €20,000 plus €48,000, so €68,000; Packing: 20% of €100,000 plus 100% of €32,000, which is €20,000 plus €32,000, so €52,000. The three pools add to €192,000, the total indirect cost, which is the first check.

Stage two, activity rates. Recipe changeovers, €72,000 over 600 changeovers, €120 per changeover; Baking, €68,000 over 5,000 oven hours, €13.60 per oven hour; Packing, €52,000 over 320,000 unit packeds, €0.1625 per unit packed.

ABC cost per product. Bread: 50 times €120 plus 3,000 times €13.60 plus 200,000 times €0.1625, which is €6,000 plus €40,800 plus €32,500, so €79,300; Pastries: 250 times €120 plus 1,500 times €13.60 plus 100,000 times €0.1625, which is €30,000 plus €20,400 plus €16,250, so €66,650; Cakes: 300 times €120 plus 500 times €13.60 plus 20,000 times €0.1625, which is €36,000 plus €6,800 plus €3,250, so €46,050. Sum €192,000, the second check.

Volume-based allocation. One rate: €192,000 over 320,000 units produced is €0.60 per unit of the base; bread 200,000 times €0.60 is €120,000; pastries 100,000 times €0.60 is €60,000; cakes 20,000 times €0.60 is €12,000.

Indirect cost bread pastries cakes
ABC, two-stage €79,300 €66,650 €46,050
Volume-based (units produced) €120,000 €60,000 €12,000
ABC minus volume-based -€40,700 +€6,650 +€34,050
ABC as a multiple of volume-based 0.66 1.11 3.84
Per unit, ABC €0.40 €0.67 €2.30
Per unit, volume-based €0.60 €0.60 €0.60

What to notice. Cakes are 6 percent of units and half the changeovers.

Exercise 3. A law firm, hours versus files. A small law firm has two practice areas: conveyancing (V) and litigation (L). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Opening and closing files Document handling
Support staff €240,000 50% 50%
Office and IT €160,000 25% 75%
Total €400,000
Activity driver conveyancing litigation Total
Opening and closing files (files) 1,280 320 1,600
Document handling (documents) 6,000 14,000 20,000
Volume base: fee-earner hours 5,000 15,000 20,000

Stage one, resources to activities. Opening and closing files: 50% of €240,000 plus 25% of €160,000, which is €120,000 plus €40,000, so €160,000; Document handling: 50% of €240,000 plus 75% of €160,000, which is €120,000 plus €120,000, so €240,000. The two pools add to €400,000, the total indirect cost, which is the first check.

Stage two, activity rates. Opening and closing files, €160,000 over 1,600 files, €100 per file; Document handling, €240,000 over 20,000 documents, €12 per document.

ABC cost per product. Conveyancing: 1,280 times €100 plus 6,000 times €12, which is €128,000 plus €72,000, so €200,000; Litigation: 320 times €100 plus 14,000 times €12, which is €32,000 plus €168,000, so €200,000. Sum €400,000, the second check.

Volume-based allocation. One rate: €400,000 over 20,000 fee-earner hours is €20 per unit of the base; conveyancing 5,000 times €20 is €100,000; litigation 15,000 times €20 is €300,000.

Indirect cost conveyancing litigation
ABC, two-stage €200,000 €200,000
Volume-based (fee-earner hours) €100,000 €300,000
ABC minus volume-based +€100,000 -€100,000
ABC as a multiple of volume-based 2.00 0.67

What to notice. Conveyancing bills a quarter of the hours and opens four fifths of the files.

Exercise 4. Warehouse: pallets and parcels. A distributor ships to retailers by pallet (R) and to consumers by parcel (E). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Receiving and putaway Picking Dispatch
Warehouse staff €300,000 30% 50% 20%
Equipment and space €150,000 40% 20% 40%
Total €450,000
Activity driver retail pallets e-commerce parcels Total
Receiving and putaway (pallet receiveds) 6,000 6,000 12,000
Picking (pick lines) 20,000 180,000 200,000
Dispatch (consignments) 4,000 60,000 64,000
Volume base: revenue (thousands) 6,000 4,000 10,000

Stage one, resources to activities. Receiving and putaway: 30% of €300,000 plus 40% of €150,000, which is €90,000 plus €60,000, so €150,000; Picking: 50% of €300,000 plus 20% of €150,000, which is €150,000 plus €30,000, so €180,000; Dispatch: 20% of €300,000 plus 40% of €150,000, which is €60,000 plus €60,000, so €120,000. The three pools add to €450,000, the total indirect cost, which is the first check.

Stage two, activity rates. Receiving and putaway, €150,000 over 12,000 pallet receiveds, €12.50 per pallet received; Picking, €180,000 over 200,000 pick lines, €0.90 per pick line; Dispatch, €120,000 over 64,000 consignments, €1.8750 per consignment.

ABC cost per product. Retail pallets: 6,000 times €12.50 plus 20,000 times €0.90 plus 4,000 times €1.8750, which is €75,000 plus €18,000 plus €7,500, so €100,500; E-commerce parcels: 6,000 times €12.50 plus 180,000 times €0.90 plus 60,000 times €1.8750, which is €75,000 plus €162,000 plus €112,500, so €349,500. Sum €450,000, the second check.

Volume-based allocation. One rate: €450,000 over 10,000 revenue (thousands) is €45 per unit of the base; retail pallets 6,000 times €45 is €270,000; e-commerce parcels 4,000 times €45 is €180,000.

Indirect cost retail pallets e-commerce parcels
ABC, two-stage €100,500 €349,500
Volume-based (revenue (thousands)) €270,000 €180,000
ABC minus volume-based -€169,500 +€169,500
ABC as a multiple of volume-based 0.37 1.94

What to notice. Parcels are 40 percent of revenue and 90 percent of pick lines.

Exercise 5. When ABC and the plant-wide rate agree. A bottling plant fills two sizes of the same drink, 0.5 l (H) and 1.0 l (F). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Line changeovers Filling
Indirect labour €200,000 40% 60%
Plant overhead €300,000 20% 80%
Total €500,000
Activity driver 0.5 l 1.0 l Total
Line changeovers (changeovers) 120 80 200
Filling (line hours) 3,000 2,000 5,000
Volume base: line hours 3,000 2,000 5,000

Stage one, resources to activities. Line changeovers: 40% of €200,000 plus 20% of €300,000, which is €80,000 plus €60,000, so €140,000; Filling: 60% of €200,000 plus 80% of €300,000, which is €120,000 plus €240,000, so €360,000. The two pools add to €500,000, the total indirect cost, which is the first check.

Stage two, activity rates. Line changeovers, €140,000 over 200 changeovers, €700 per changeover; Filling, €360,000 over 5,000 line hours, €72 per line hour.

ABC cost per product. 0.5 l: 120 times €700 plus 3,000 times €72, which is €84,000 plus €216,000, so €300,000; 1.0 l: 80 times €700 plus 2,000 times €72, which is €56,000 plus €144,000, so €200,000. Sum €500,000, the second check.

Volume-based allocation. One rate: €500,000 over 5,000 line hours is €100 per unit of the base; 0.5 l 3,000 times €100 is €300,000; 1.0 l 2,000 times €100 is €200,000.

Indirect cost 0.5 l 1.0 l
ABC, two-stage €300,000 €200,000
Volume-based (line hours) €300,000 €200,000
ABC minus volume-based €0 €0
ABC as a multiple of volume-based 1.00 1.00

What to notice. Both drivers split 60:40, so ABC and the volume rate give the same answer. ABC only changes the answer when consumption ratios differ.

Exercise 6. A hospital laboratory. A lab runs routine blood panels (T) and specialist genetic tests (G). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Sample reception Running tests Validation and reporting
Technician time €420,000 25% 50% 25%
Analysers and reagents overhead €280,000 0% 100% 0%
Quality and admin €100,000 20% 20% 60%
Total €800,000
Activity driver routine panels genetic tests Total
Sample reception (samples) 90,000 10,000 100,000
Running tests (analyser hours) 6,000 4,000 10,000
Validation and reporting (reports) 4,000 6,000 10,000
Volume base: tests performed 90,000 10,000 100,000

Stage one, resources to activities. Sample reception: 25% of €420,000 plus 20% of €100,000, which is €105,000 plus €20,000, so €125,000; Running tests: 50% of €420,000 plus 100% of €280,000 plus 20% of €100,000, which is €210,000 plus €280,000 plus €20,000, so €510,000; Validation and reporting: 25% of €420,000 plus 60% of €100,000, which is €105,000 plus €60,000, so €165,000. The three pools add to €800,000, the total indirect cost, which is the first check.

Stage two, activity rates. Sample reception, €125,000 over 100,000 samples, €1.25 per sample; Running tests, €510,000 over 10,000 analyser hours, €51 per analyser hour; Validation and reporting, €165,000 over 10,000 reports, €16.50 per report.

ABC cost per product. Routine panels: 90,000 times €1.25 plus 6,000 times €51 plus 4,000 times €16.50, which is €112,500 plus €306,000 plus €66,000, so €484,500; Genetic tests: 10,000 times €1.25 plus 4,000 times €51 plus 6,000 times €16.50, which is €12,500 plus €204,000 plus €99,000, so €315,500. Sum €800,000, the second check.

Volume-based allocation. One rate: €800,000 over 100,000 tests performed is €8 per unit of the base; routine panels 90,000 times €8 is €720,000; genetic tests 10,000 times €8 is €80,000.

Indirect cost routine panels genetic tests
ABC, two-stage €484,500 €315,500
Volume-based (tests performed) €720,000 €80,000
ABC minus volume-based -€235,500 +€235,500
ABC as a multiple of volume-based 0.67 3.94

What to notice. Genetic tests are a tenth of the volume and 60 percent of the validation and reporting work.

Exercise 7. A print shop with a rush product. A print shop sells standard runs (S) and rush jobs (J). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Job setup Printing Order handling
Prepress staff €90,000 100% 0% 0%
Press overhead €210,000 30% 70% 0%
Customer service €60,000 0% 0% 100%
Total €360,000
Activity driver standard runs rush jobs Total
Job setup (jobs) 400 600 1,000
Printing (press hours) 7,000 3,000 10,000
Order handling (orders) 400 600 1,000
Volume base: press hours 7,000 3,000 10,000

Stage one, resources to activities. Job setup: 100% of €90,000 plus 30% of €210,000, which is €90,000 plus €63,000, so €153,000; Printing: 70% of €210,000, so €147,000; Order handling: 100% of €60,000, so €60,000. The three pools add to €360,000, the total indirect cost, which is the first check.

Stage two, activity rates. Job setup, €153,000 over 1,000 jobs, €153 per job; Printing, €147,000 over 10,000 press hours, €14.70 per press hour; Order handling, €60,000 over 1,000 orders, €60 per order.

ABC cost per product. Standard runs: 400 times €153 plus 7,000 times €14.70 plus 400 times €60, which is €61,200 plus €102,900 plus €24,000, so €188,100; Rush jobs: 600 times €153 plus 3,000 times €14.70 plus 600 times €60, which is €91,800 plus €44,100 plus €36,000, so €171,900. Sum €360,000, the second check.

Volume-based allocation. One rate: €360,000 over 10,000 press hours is €36 per unit of the base; standard runs 7,000 times €36 is €252,000; rush jobs 3,000 times €36 is €108,000.

Indirect cost standard runs rush jobs
ABC, two-stage €188,100 €171,900
Volume-based (press hours) €252,000 €108,000
ABC minus volume-based -€63,900 +€63,900
ABC as a multiple of volume-based 0.75 1.59

What to notice. Rush jobs take 30 percent of the press and 60 percent of the setups and calls.

Exercise 8. Software support: enterprise and self-serve. A software company supports enterprise accounts (N) and self-serve accounts (Z). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Ticket handling Onboarding calls Escalations
Support engineers €600,000 55% 30% 15%
Tools and infrastructure €150,000 60% 10% 30%
Total €750,000
Activity driver enterprise self-serve Total
Ticket handling (tickets) 12,000 28,000 40,000
Onboarding calls (calls) 900 100 1,000
Escalations (escalations) 450 50 500
Volume base: revenue (thousands) 5,000 5,000 10,000

Stage one, resources to activities. Ticket handling: 55% of €600,000 plus 60% of €150,000, which is €330,000 plus €90,000, so €420,000; Onboarding calls: 30% of €600,000 plus 10% of €150,000, which is €180,000 plus €15,000, so €195,000; Escalations: 15% of €600,000 plus 30% of €150,000, which is €90,000 plus €45,000, so €135,000. The three pools add to €750,000, the total indirect cost, which is the first check.

Stage two, activity rates. Ticket handling, €420,000 over 40,000 tickets, €10.50 per ticket; Onboarding calls, €195,000 over 1,000 calls, €195 per call; Escalations, €135,000 over 500 escalations, €270 per escalation.

ABC cost per product. Enterprise: 12,000 times €10.50 plus 900 times €195 plus 450 times €270, which is €126,000 plus €175,500 plus €121,500, so €423,000; Self-serve: 28,000 times €10.50 plus 100 times €195 plus 50 times €270, which is €294,000 plus €19,500 plus €13,500, so €327,000. Sum €750,000, the second check.

Volume-based allocation. One rate: €750,000 over 10,000 revenue (thousands) is €75 per unit of the base; enterprise 5,000 times €75 is €375,000; self-serve 5,000 times €75 is €375,000.

Indirect cost enterprise self-serve
ABC, two-stage €423,000 €327,000
Volume-based (revenue (thousands)) €375,000 €375,000
ABC minus volume-based +€48,000 -€48,000
ABC as a multiple of volume-based 1.13 0.87

What to notice. Equal revenue, but enterprise takes 90 percent of the onboarding and escalation effort.

Exercise 9. Two products with a zero driver. A furniture maker sells a flat-pack shelf (F) and a hand-finished table (H). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Hand finishing Assembly
Finishing shop €150,000 100% 0%
Production overhead €250,000 0% 100%
Total €400,000
Activity driver flat-pack shelf hand-finished table Total
Hand finishing (finishing hours) 0 5,000 5,000
Assembly (assembly hours) 15,000 10,000 25,000
Volume base: direct labour hours 15,000 10,000 25,000

Stage one, resources to activities. Hand finishing: 100% of €150,000, so €150,000; Assembly: 100% of €250,000, so €250,000. The two pools add to €400,000, the total indirect cost, which is the first check.

Stage two, activity rates. Hand finishing, €150,000 over 5,000 finishing hours, €30 per finishing hour; Assembly, €250,000 over 25,000 assembly hours, €10 per assembly hour.

ABC cost per product. Flat-pack shelf: 15,000 times €10, so €150,000; Hand-finished table: 5,000 times €30 plus 10,000 times €10, which is €150,000 plus €100,000, so €250,000. Sum €400,000, the second check.

Volume-based allocation. One rate: €400,000 over 25,000 direct labour hours is €16 per unit of the base; flat-pack shelf 15,000 times €16 is €240,000; hand-finished table 10,000 times €16 is €160,000.

Indirect cost flat-pack shelf hand-finished table
ABC, two-stage €150,000 €250,000
Volume-based (direct labour hours) €240,000 €160,000
ABC minus volume-based -€90,000 +€90,000
ABC as a multiple of volume-based 0.62 1.56

What to notice. The shelf never enters the finishing shop; the labour-hour rate charges it 60 percent of that shop anyway.

Exercise 10. Batch-level costs and a small runner. A cosmetics plant makes a high-volume cream (M) and a low-volume serum (Q). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Batch testing Batch preparation Filling and packing
Quality control €120,000 100% 0% 0%
Materials handling €80,000 0% 100% 0%
Line overhead €400,000 0% 20% 80%
Total €600,000
Activity driver cream serum Total
Batch testing (batchs) 100 300 400
Batch preparation (batchs) 100 300 400
Filling and packing (units) 180,000 20,000 200,000
Volume base: units produced 180,000 20,000 200,000

Stage one, resources to activities. Batch testing: 100% of €120,000, so €120,000; Batch preparation: 100% of €80,000 plus 20% of €400,000, which is €80,000 plus €80,000, so €160,000; Filling and packing: 80% of €400,000, so €320,000. The three pools add to €600,000, the total indirect cost, which is the first check.

Stage two, activity rates. Batch testing, €120,000 over 400 batchs, €300 per batch; Batch preparation, €160,000 over 400 batchs, €400 per batch; Filling and packing, €320,000 over 200,000 units, €1.60 per unit.

ABC cost per product. Cream: 100 times €300 plus 100 times €400 plus 180,000 times €1.60, which is €30,000 plus €40,000 plus €288,000, so €358,000; Serum: 300 times €300 plus 300 times €400 plus 20,000 times €1.60, which is €90,000 plus €120,000 plus €32,000, so €242,000. Sum €600,000, the second check.

Volume-based allocation. One rate: €600,000 over 200,000 units produced is €3 per unit of the base; cream 180,000 times €3 is €540,000; serum 20,000 times €3 is €60,000.

Indirect cost cream serum
ABC, two-stage €358,000 €242,000
Volume-based (units produced) €540,000 €60,000
ABC minus volume-based -€182,000 +€182,000
ABC as a multiple of volume-based 0.66 4.03
Per unit, ABC €1.99 €12.10
Per unit, volume-based €3.00 €3.00

What to notice. The serum is 10 percent of units and 75 percent of batches.

Exercise 11. A logistics company by route type. A haulier runs full-truck loads (T) and groupage consignments (G). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Cross-docking Route planning Customer documentation
Depot staff €260,000 70% 0% 30%
Planning and admin €140,000 20% 50% 30%
Total €400,000
Activity driver full loads groupage Total
Cross-docking (consignment handleds) 0 30,000 30,000
Route planning (routes) 2,000 6,000 8,000
Customer documentation (document sets) 2,000 18,000 20,000
Volume base: kilometres (thousands) 2,500 1,500 4,000

Stage one, resources to activities. Cross-docking: 70% of €260,000 plus 20% of €140,000, which is €182,000 plus €28,000, so €210,000; Route planning: 50% of €140,000, so €70,000; Customer documentation: 30% of €260,000 plus 30% of €140,000, which is €78,000 plus €42,000, so €120,000. The three pools add to €400,000, the total indirect cost, which is the first check.

Stage two, activity rates. Cross-docking, €210,000 over 30,000 consignment handleds, €7 per consignment handled; Route planning, €70,000 over 8,000 routes, €8.75 per route; Customer documentation, €120,000 over 20,000 document sets, €6 per document set.

ABC cost per product. Full loads: 2,000 times €8.75 plus 2,000 times €6, which is €17,500 plus €12,000, so €29,500; Groupage: 30,000 times €7 plus 6,000 times €8.75 plus 18,000 times €6, which is €210,000 plus €52,500 plus €108,000, so €370,500. Sum €400,000, the second check.

Volume-based allocation. One rate: €400,000 over 4,000 kilometres (thousands) is €100 per unit of the base; full loads 2,500 times €100 is €250,000; groupage 1,500 times €100 is €150,000.

Indirect cost full loads groupage
ABC, two-stage €29,500 €370,500
Volume-based (kilometres (thousands)) €250,000 €150,000
ABC minus volume-based -€220,500 +€220,500
ABC as a multiple of volume-based 0.12 2.47

What to notice. Full loads never touch the cross-dock; a kilometre rate charges them 62.5 percent of it.

Exercise 12. A bank branch network product view. A retail bank looks at current accounts (A) and mortgages (M) through its branch cost. Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Counter transactions Advisory meetings
Branch staff €900,000 60% 40%
Premises and systems €600,000 50% 50%
Total €1,500,000
Activity driver current accounts mortgages Total
Counter transactions (transactions) 450,000 50,000 500,000
Advisory meetings (meetings) 2,000 8,000 10,000
Volume base: accounts held 40,000 10,000 50,000

Stage one, resources to activities. Counter transactions: 60% of €900,000 plus 50% of €600,000, which is €540,000 plus €300,000, so €840,000; Advisory meetings: 40% of €900,000 plus 50% of €600,000, which is €360,000 plus €300,000, so €660,000. The two pools add to €1,500,000, the total indirect cost, which is the first check.

Stage two, activity rates. Counter transactions, €840,000 over 500,000 transactions, €1.68 per transaction; Advisory meetings, €660,000 over 10,000 meetings, €66 per meeting.

ABC cost per product. Current accounts: 450,000 times €1.68 plus 2,000 times €66, which is €756,000 plus €132,000, so €888,000; Mortgages: 50,000 times €1.68 plus 8,000 times €66, which is €84,000 plus €528,000, so €612,000. Sum €1,500,000, the second check.

Volume-based allocation. One rate: €1,500,000 over 50,000 accounts held is €30 per unit of the base; current accounts 40,000 times €30 is €1,200,000; mortgages 10,000 times €30 is €300,000.

Indirect cost current accounts mortgages
ABC, two-stage €888,000 €612,000
Volume-based (accounts held) €1,200,000 €300,000
ABC minus volume-based -€312,000 +€312,000
ABC as a multiple of volume-based 0.74 2.04

What to notice. Mortgages are a fifth of the accounts and 80 percent of the meetings.

Exercise 13. Three products, two activities, one distortion. A plastics moulder makes bins (B), crates (C) and a bespoke housing (D). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Mould changes Moulding
Mould setters €144,000 100% 0%
Machine overhead €360,000 10% 90%
Total €504,000
Activity driver bins crates bespoke housing Total
Mould changes (mould changes) 40 70 250 360
Moulding (machine hours) 5,000 4,000 1,000 10,000
Volume base: machine hours 5,000 4,000 1,000 10,000

Stage one, resources to activities. Mould changes: 100% of €144,000 plus 10% of €360,000, which is €144,000 plus €36,000, so €180,000; Moulding: 90% of €360,000, so €324,000. The two pools add to €504,000, the total indirect cost, which is the first check.

Stage two, activity rates. Mould changes, €180,000 over 360 mould changes, €500 per mould change; Moulding, €324,000 over 10,000 machine hours, €32.40 per machine hour.

ABC cost per product. Bins: 40 times €500 plus 5,000 times €32.40, which is €20,000 plus €162,000, so €182,000; Crates: 70 times €500 plus 4,000 times €32.40, which is €35,000 plus €129,600, so €164,600; Bespoke housing: 250 times €500 plus 1,000 times €32.40, which is €125,000 plus €32,400, so €157,400. Sum €504,000, the second check.

Volume-based allocation. One rate: €504,000 over 10,000 machine hours is €50.40 per unit of the base; bins 5,000 times €50.40 is €252,000; crates 4,000 times €50.40 is €201,600; bespoke housing 1,000 times €50.40 is €50,400.

Indirect cost bins crates bespoke housing
ABC, two-stage €182,000 €164,600 €157,400
Volume-based (machine hours) €252,000 €201,600 €50,400
ABC minus volume-based -€70,000 -€37,000 +€107,000
ABC as a multiple of volume-based 0.72 0.82 3.12

What to notice. The bespoke housing has 10 percent of the hours and 69 percent of the mould changes.

Exercise 14. A consultancy: proposals and delivery. A consultancy sells fixed-scope projects (F) and time-and-materials work (W). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Writing proposals Reviewing deliverables
Partners’ non-billable time €300,000 50% 50%
Business development €120,000 100% 0%
Office €180,000 10% 90%
Total €600,000
Activity driver fixed-scope time and materials Total
Writing proposals (proposals) 90 30 120
Reviewing deliverables (reviews) 300 300 600
Volume base: billable hours 12,000 18,000 30,000

Stage one, resources to activities. Writing proposals: 50% of €300,000 plus 100% of €120,000 plus 10% of €180,000, which is €150,000 plus €120,000 plus €18,000, so €288,000; Reviewing deliverables: 50% of €300,000 plus 90% of €180,000, which is €150,000 plus €162,000, so €312,000. The two pools add to €600,000, the total indirect cost, which is the first check.

Stage two, activity rates. Writing proposals, €288,000 over 120 proposals, €2,400 per proposal; Reviewing deliverables, €312,000 over 600 reviews, €520 per review.

ABC cost per product. Fixed-scope: 90 times €2,400 plus 300 times €520, which is €216,000 plus €156,000, so €372,000; Time and materials: 30 times €2,400 plus 300 times €520, which is €72,000 plus €156,000, so €228,000. Sum €600,000, the second check.

Volume-based allocation. One rate: €600,000 over 30,000 billable hours is €20 per unit of the base; fixed-scope 12,000 times €20 is €240,000; time and materials 18,000 times €20 is €360,000.

Indirect cost fixed-scope time and materials
ABC, two-stage €372,000 €228,000
Volume-based (billable hours) €240,000 €360,000
ABC minus volume-based +€132,000 -€132,000
ABC as a multiple of volume-based 1.55 0.63

What to notice. Fixed-scope work is 40 percent of hours and 75 percent of the proposals written.

Exercise 15. A restaurant group with two formats. A restaurant group runs a dine-in format (D) and a delivery-only kitchen (K). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Menu development Order management Bulk preparation
Head office €240,000 30% 50% 20%
Central kitchen prep €160,000 25% 0% 75%
Total €400,000
Activity driver dine-in delivery kitchen Total
Menu development (menu items) 60 20 80
Order management (orders) 40,000 160,000 200,000
Bulk preparation (kg prepareds) 30,000 20,000 50,000
Volume base: revenue (thousands) 7,000 3,000 10,000

Stage one, resources to activities. Menu development: 30% of €240,000 plus 25% of €160,000, which is €72,000 plus €40,000, so €112,000; Order management: 50% of €240,000, so €120,000; Bulk preparation: 20% of €240,000 plus 75% of €160,000, which is €48,000 plus €120,000, so €168,000. The three pools add to €400,000, the total indirect cost, which is the first check.

Stage two, activity rates. Menu development, €112,000 over 80 menu items, €1,400 per menu item; Order management, €120,000 over 200,000 orders, €0.60 per order; Bulk preparation, €168,000 over 50,000 kg prepareds, €3.36 per kg prepared.

ABC cost per product. Dine-in: 60 times €1,400 plus 40,000 times €0.60 plus 30,000 times €3.36, which is €84,000 plus €24,000 plus €100,800, so €208,800; Delivery kitchen: 20 times €1,400 plus 160,000 times €0.60 plus 20,000 times €3.36, which is €28,000 plus €96,000 plus €67,200, so €191,200. Sum €400,000, the second check.

Volume-based allocation. One rate: €400,000 over 10,000 revenue (thousands) is €40 per unit of the base; dine-in 7,000 times €40 is €280,000; delivery kitchen 3,000 times €40 is €120,000.

Indirect cost dine-in delivery kitchen
ABC, two-stage €208,800 €191,200
Volume-based (revenue (thousands)) €280,000 €120,000
ABC minus volume-based -€71,200 +€71,200
ABC as a multiple of volume-based 0.75 1.59

What to notice. Delivery is 30 percent of revenue and 80 percent of the orders managed.

Exercise 16. Two-stage with resource drivers by headcount and floor space. A workshop allocates its indirect costs to activities with resource drivers rather than estimated percentages. Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Inspection Material movement Production support
Supervision (4 people) €200,000 25% 25% 50%
Rent (1,000 m2) €150,000 10% 40% 50%
Total €350,000
Activity driver product X product Y Total
Inspection (inspections) 100 400 500
Material movement (moves) 300 700 1,000
Production support (labour hours) 6,000 4,000 10,000
Volume base: direct labour hours 6,000 4,000 10,000

Stage one, resources to activities. Inspection: 25% of €200,000 plus 10% of €150,000, which is €50,000 plus €15,000, so €65,000; Material movement: 25% of €200,000 plus 40% of €150,000, which is €50,000 plus €60,000, so €110,000; Production support: 50% of €200,000 plus 50% of €150,000, which is €100,000 plus €75,000, so €175,000. The three pools add to €350,000, the total indirect cost, which is the first check.

Stage two, activity rates. Inspection, €65,000 over 500 inspections, €130 per inspection; Material movement, €110,000 over 1,000 moves, €110 per move; Production support, €175,000 over 10,000 labour hours, €17.50 per labour hour.

ABC cost per product. Product x: 100 times €130 plus 300 times €110 plus 6,000 times €17.50, which is €13,000 plus €33,000 plus €105,000, so €151,000; Product y: 400 times €130 plus 700 times €110 plus 4,000 times €17.50, which is €52,000 plus €77,000 plus €70,000, so €199,000. Sum €350,000, the second check.

Volume-based allocation. One rate: €350,000 over 10,000 direct labour hours is €35 per unit of the base; product X 6,000 times €35 is €210,000; product Y 4,000 times €35 is €140,000.

Indirect cost product X product Y
ABC, two-stage €151,000 €199,000
Volume-based (direct labour hours) €210,000 €140,000
ABC minus volume-based -€59,000 +€59,000
ABC as a multiple of volume-based 0.72 1.42

What to notice. Supervision is split 1:1:2 by headcount and rent 100:400:500 by square metres; the percentages are measurements, not opinions.

Exercise 17. An electronics assembler with engineering change orders. An assembler builds a mature board (A) and a new board still being revised (N). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Engineering changes Testing Assembly support
Engineering €320,000 75% 25% 0%
Assembly overhead €480,000 5% 35% 60%
Total €800,000
Activity driver mature board new board Total
Engineering changes (change orders) 10 90 100
Testing (test hours) 30,000 10,000 40,000
Assembly support (support hours) 36,000 12,000 48,000
Volume base: units produced 40,000 10,000 50,000

Stage one, resources to activities. Engineering changes: 75% of €320,000 plus 5% of €480,000, which is €240,000 plus €24,000, so €264,000; Testing: 25% of €320,000 plus 35% of €480,000, which is €80,000 plus €168,000, so €248,000; Assembly support: 60% of €480,000, so €288,000. The three pools add to €800,000, the total indirect cost, which is the first check.

Stage two, activity rates. Engineering changes, €264,000 over 100 change orders, €2,640 per change order; Testing, €248,000 over 40,000 test hours, €6.20 per test hour; Assembly support, €288,000 over 48,000 support hours, €6 per support hour.

ABC cost per product. Mature board: 10 times €2,640 plus 30,000 times €6.20 plus 36,000 times €6, which is €26,400 plus €186,000 plus €216,000, so €428,400; New board: 90 times €2,640 plus 10,000 times €6.20 plus 12,000 times €6, which is €237,600 plus €62,000 plus €72,000, so €371,600. Sum €800,000, the second check.

Volume-based allocation. One rate: €800,000 over 50,000 units produced is €16 per unit of the base; mature board 40,000 times €16 is €640,000; new board 10,000 times €16 is €160,000.

Indirect cost mature board new board
ABC, two-stage €428,400 €371,600
Volume-based (units produced) €640,000 €160,000
ABC minus volume-based -€211,600 +€211,600
ABC as a multiple of volume-based 0.67 2.32
Per unit, ABC €10.71 €37.16
Per unit, volume-based €16.00 €16.00

What to notice. The new board is a fifth of the units and 90 percent of the change orders.

Exercise 18. A clinic: consultations and minor procedures. A clinic offers consultations (C) and minor procedures (P). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Patient administration Room preparation Clinical assistance
Nursing €180,000 10% 30% 60%
Reception €60,000 100% 0% 0%
Rooms and equipment €120,000 0% 40% 60%
Total €360,000
Activity driver consultations procedures Total
Patient administration (visits) 16,000 4,000 20,000
Room preparation (preparations) 16,000 8,000 24,000
Clinical assistance (assistance minutes) 32,000 48,000 80,000
Volume base: patient visits 16,000 4,000 20,000

Stage one, resources to activities. Patient administration: 10% of €180,000 plus 100% of €60,000, which is €18,000 plus €60,000, so €78,000; Room preparation: 30% of €180,000 plus 40% of €120,000, which is €54,000 plus €48,000, so €102,000; Clinical assistance: 60% of €180,000 plus 60% of €120,000, which is €108,000 plus €72,000, so €180,000. The three pools add to €360,000, the total indirect cost, which is the first check.

Stage two, activity rates. Patient administration, €78,000 over 20,000 visits, €3.90 per visit; Room preparation, €102,000 over 24,000 preparations, €4.25 per preparation; Clinical assistance, €180,000 over 80,000 assistance minutes, €2.25 per assistance minute.

ABC cost per product. Consultations: 16,000 times €3.90 plus 16,000 times €4.25 plus 32,000 times €2.25, which is €62,400 plus €68,000 plus €72,000, so €202,400; Procedures: 4,000 times €3.90 plus 8,000 times €4.25 plus 48,000 times €2.25, which is €15,600 plus €34,000 plus €108,000, so €157,600. Sum €360,000, the second check.

Volume-based allocation. One rate: €360,000 over 20,000 patient visits is €18 per unit of the base; consultations 16,000 times €18 is €288,000; procedures 4,000 times €18 is €72,000.

Indirect cost consultations procedures
ABC, two-stage €202,400 €157,600
Volume-based (patient visits) €288,000 €72,000
ABC minus volume-based -€85,600 +€85,600
ABC as a multiple of volume-based 0.70 2.19

What to notice. Procedures are a fifth of the visits and 60 percent of the assistance minutes.

Exercise 19. A wholesaler by customer segment. A wholesaler serves supermarket chains (S) and independent shops (I). Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Store visits Order processing Deliveries
Sales and merchandising €360,000 80% 20% 0%
Order office €140,000 0% 100% 0%
Distribution overhead €300,000 0% 20% 80%
Total €800,000
Activity driver supermarkets independents Total
Store visits (visits) 400 3,600 4,000
Order processing (orders) 2,000 18,000 20,000
Deliveries (deliverys) 1,500 8,500 10,000
Volume base: revenue (thousands) 7,000 3,000 10,000

Stage one, resources to activities. Store visits: 80% of €360,000, so €288,000; Order processing: 20% of €360,000 plus 100% of €140,000 plus 20% of €300,000, which is €72,000 plus €140,000 plus €60,000, so €272,000; Deliveries: 80% of €300,000, so €240,000. The three pools add to €800,000, the total indirect cost, which is the first check.

Stage two, activity rates. Store visits, €288,000 over 4,000 visits, €72 per visit; Order processing, €272,000 over 20,000 orders, €13.60 per order; Deliveries, €240,000 over 10,000 deliverys, €24 per delivery.

ABC cost per product. Supermarkets: 400 times €72 plus 2,000 times €13.60 plus 1,500 times €24, which is €28,800 plus €27,200 plus €36,000, so €92,000; Independents: 3,600 times €72 plus 18,000 times €13.60 plus 8,500 times €24, which is €259,200 plus €244,800 plus €204,000, so €708,000. Sum €800,000, the second check.

Volume-based allocation. One rate: €800,000 over 10,000 revenue (thousands) is €80 per unit of the base; supermarkets 7,000 times €80 is €560,000; independents 3,000 times €80 is €240,000.

Indirect cost supermarkets independents
ABC, two-stage €92,000 €708,000
Volume-based (revenue (thousands)) €560,000 €240,000
ABC minus volume-based -€468,000 +€468,000
ABC as a multiple of volume-based 0.16 2.95

What to notice. Independents are 30 percent of revenue and 90 percent of the visits and orders.

Exercise 20. The full two-stage template, three of everything. A components maker has three resources, three activities and three products; the exercise is the complete template. Indirect costs for the period, the share of each resource consumed by each activity (stage one), and the activity driver quantities per product (stage two), are:

Resource Cost Setups Inspection Machining
Indirect labour €240,000 40% 30% 30%
Equipment €180,000 20% 10% 70%
Facilities €120,000 10% 20% 70%
Total €540,000
Activity driver P1 P2 P3 Total
Setups (setups) 20 60 120 200
Inspection (inspections) 200 300 500 1,000
Machining (machine hours) 6,000 3,000 1,000 10,000
Volume base: machine hours 6,000 3,000 1,000 10,000

Stage one, resources to activities. Setups: 40% of €240,000 plus 20% of €180,000 plus 10% of €120,000, which is €96,000 plus €36,000 plus €12,000, so €144,000; Inspection: 30% of €240,000 plus 10% of €180,000 plus 20% of €120,000, which is €72,000 plus €18,000 plus €24,000, so €114,000; Machining: 30% of €240,000 plus 70% of €180,000 plus 70% of €120,000, which is €72,000 plus €126,000 plus €84,000, so €282,000. The three pools add to €540,000, the total indirect cost, which is the first check.

Stage two, activity rates. Setups, €144,000 over 200 setups, €720 per setup; Inspection, €114,000 over 1,000 inspections, €114 per inspection; Machining, €282,000 over 10,000 machine hours, €28.20 per machine hour.

ABC cost per product. P1: 20 times €720 plus 200 times €114 plus 6,000 times €28.20, which is €14,400 plus €22,800 plus €169,200, so €206,400; P2: 60 times €720 plus 300 times €114 plus 3,000 times €28.20, which is €43,200 plus €34,200 plus €84,600, so €162,000; P3: 120 times €720 plus 500 times €114 plus 1,000 times €28.20, which is €86,400 plus €57,000 plus €28,200, so €171,600. Sum €540,000, the second check.

Volume-based allocation. One rate: €540,000 over 10,000 machine hours is €54 per unit of the base; P1 6,000 times €54 is €324,000; P2 3,000 times €54 is €162,000; P3 1,000 times €54 is €54,000.

Indirect cost P1 P2 P3
ABC, two-stage €206,400 €162,000 €171,600
Volume-based (machine hours) €324,000 €162,000 €54,000
ABC minus volume-based -€117,600 €0 +€117,600
ABC as a multiple of volume-based 0.64 1.00 3.18

What to notice. P3 has a tenth of the hours, 60 percent of the setups and half the inspections.

4.03
the multiple by which the volume rate under-costs the serum in Exercise 10: €60,000 charged, €242,000 caused
1.00
the multiple in Exercise 5, where both drivers split 60:40 and ABC changes nothing, which is the honest test of when it is worth doing
€0
of finishing-shop cost caused by the flat-pack shelf in Exercise 9, and €90,000 charged to it by the labour-hour rate

What the twenty have in common

Line the comparison tables up and one pattern repeats eighteen times. The product or customer with the smaller volume and the larger share of batch-level, order-level or customer-level activity is under-costed by the volume base, and the multiple is largest where the volume base is furthest from what drives the cost: units in Exercises 2, 10 and 17, revenue in 4, 8, 15 and 19, kilometres in 11. Where the base is at least a plausible proxy for one of the activities (machine hours for machining, labour hours for production support), the distortion is smaller and it is concentrated in the other activities, the ones that scale with batches and transactions rather than with volume. That is Cooper’s hierarchy at work, and the hierarchy article is the theory behind these tables.

The two exceptions are worth more than the eighteen. Exercise 5 is the case where ABC and the plant-wide rate agree, because the two products consume changeovers and filling in exactly the ratio they consume line hours. It is there to make a point that gets lost in enthusiasm for the method: ABC only changes an answer when consumption ratios differ across activities, and a company whose products are genuinely similar does not need it. Exercise 20 has a product, P2, for which the two methods coincide while its two siblings move in opposite directions; the agreement is a coincidence of the numbers, and it is included because in a real model that coincidence is common enough that a product looking “unchanged” is not evidence that the old allocation was right for it.

Two things the exercises deliberately do not do. They do not show the effect on price or on the decision, because that depends on the direct costs and the margins, which vary by exercise and would have doubled its length; take any one of them, add a direct cost and a selling price per product, and the decision content appears immediately. And they do not touch capacity: every pool is fully assigned to products, so a product’s cost rises when the plant is quiet and falls when it is busy, which is the weakness that time-driven ABC removes by pricing the activity at the rate of practical capacity and reporting the unused part separately. The companion set of TDABC exercises does exactly that on the same kind of data.

The volume rate is not wrong because it is simple. It is wrong because it assumes every product consumes every indirect activity in proportion to one thing, and in nineteen of these twenty exercises that is not true. Run the comparison. The distortion is a number, and the number is what convinces people.

Related reading: activity-based costing, cost pool, cost driver and cross-subsidy in the glossary, the ABC method page, the four words textbooks keep confusing, the same data through two models and how to allocate overhead correctly, for what to do once the distortion is visible.