Three rulebooks, three denominators. IAS 2 tells a company reporting under IFRS to charge fixed production overhead to inventory on the basis of normal capacity, the output it expects on average over several periods. The US Treasury regulation on manufacturers’ inventories, 26 CFR 1.471-11, lets a taxpayer use practical capacity instead and deduct the fixed cost of the idle part in the year it arises. The US Cost Accounting Standards accept rates set in advance from forecasts, and require material differences between actual and applied overhead to be allocated back in proportion to what each cost objective was charged. Textbooks call that leftover over- or under-absorbed overhead. The three rulebooks are deciding two things: what goes into the rate’s denominator, and where the leftover goes at year end. I think the first choice matters more than the mechanics of the second, so this article works one year on all three denominators and shows what each one does to product cost.
One packing line, one year
The figures are illustrative. A contract packer runs one automated line. Its fixed overhead budget for the year is €630,000: depreciation of the line, the lease share, supervision, the service contract, insurance. Variable overhead, power, compressed air and consumables, is budgeted at €5.00 per line hour. Three volume figures are on the table before the year starts:
| Denominator | Line hours | What it is | Fixed rate | Combined rate |
|---|---|---|---|---|
| Budgeted volume | 35,000 | What the sales plan says the line will run this year | €18.00 | €23.00 |
| Normal capacity | 36,000 | The average the line has run over recent years, after planned maintenance | €17.50 | €22.50 |
| Practical capacity | 42,000 | What two shifts could deliver with normal breakdowns, changeovers and breaks allowed for | €15.00 | €20.00 |
The year came in short. The line ran 31,500 hours. Fixed overhead was €641,000, €11,000 over budget after an insurance renewal. Variable overhead was €163,800, or €5.20 per hour actually run. Actual overhead in total: €804,800. That number does not depend on any choice made below; only the way it is split between products and the period does.
On budgeted volume
Jobs were charged €23.00 per line hour, so 31,500 hours absorbed €724,500. Actual exceeds applied by €80,300, the under-absorption. It breaks into three pieces, and each belongs to a different person:
- Fixed spending: €641,000 against €630,000, so €11,000 adverse. The insurance renewal.
- Variable spending: €163,800 against 31,500 hours at €5.00, which is €157,500, so €6,300 adverse. The price of power.
- Volume: 3,500 hours short of the 35,000 planned, times the €18.00 fixed rate, so €63,000 adverse. Nobody spent this. It is what happens when a forecast is divided by a forecast and the second forecast misses.
€11,000 + €6,300 + €63,000 = €80,300. More than three-quarters of the gap is not a spending problem at all.
Disposing of the €80,300
If the amount is small, it goes to cost of sales and the year’s profit absorbs it. If it is material, it is spread back over wherever the applied overhead ended up. Cost Accounting Standard 418 puts the rule plainly for government contractors: material variances are allocated to cost objectives “in proportion to the costs previously allocated” at the preestablished rates. Suppose the €724,500 applied sits 8 percent in work in progress, 17 percent in finished goods and 75 percent in cost of sales. Work in progress takes €6,424, finished goods €13,651 and cost of sales €60,225, which add back to €80,300.
The proration is tidy, and it has a consequence that is easy to miss: €20,075 has just been capitalised into stock, and €15,750 of it is a share of the volume shortfall, as if idle hours were part of what the goods cost to make. IAS 2 is written to stop exactly that.
On normal capacity, as IAS 2 requires
IAS 2, paragraph 13, says the allocation of fixed production overhead “is based on the normal capacity of the production facilities”, that the amount allocated to each unit “is not increased as a consequence of low production or idle plant”, and that unallocated overheads are recognised as an expense in the period. On this line the fixed rate is €17.50. The line ran 4,500 hours below normal capacity, so €78,750 of fixed cost stays out of inventory and goes straight to the income statement. No proration can bring it back into stock.
The standard also allows the actual level of production to be used when it approximates normal capacity, which is why many companies with steady volume never notice the rule. The test is in a year like this one, 12.5 percent below normal.
On practical capacity
Change nothing but the denominator. Fixed rate €15.00, combined €20.00, applied €630,000, under-absorbed €174,800. The spending variances are unchanged at €11,000 and €6,300, because they never depended on the denominator. The rest, 10,500 hours times €15.00, is €157,500, and it now has a plain meaning: the company paid for 42,000 hours of line time and used 31,500.
The US tax regulation describes this method almost word for word. Under 26 CFR 1.471-11(d)(4), the share of practical capacity represented by actual production sets how much fixed indirect cost goes into inventory, and the difference “is allowable as a deduction” in the year. It also explains how practical capacity is reached: either from the taxpayer’s historical experience, or from theoretical capacity “adjusted for allowances” such as machine breakdown, idle time and normal work stoppages.
Measuring practical capacity is the hard part, and it is worth saying so. When the US Federal Accounting Standards Advisory Board issued its managerial cost accounting standard in 1995, its exposure draft had proposed that federal entities measure the cost of unused capacity against practical capacity and report it as a separate expense. Most agencies replied that they had neither the guidance nor the accounting capability to measure their capacity reliably, and the Board dropped the requirement as premature, saying it might reconsider it later. For one packing line the measurement is a few days with the maintenance log and the shift pattern. For a back office it is a project. Either way, the practical-capacity figure should be written down with its assumptions and revisited when the line or the team changes, which is also what the tax regulation asks for.
The three answers side by side
| Budgeted volume | Normal capacity (IAS 2) | Practical capacity | |
|---|---|---|---|
| Combined rate per line hour | €23.00 | €22.50 | €20.00 |
| Overhead applied to jobs | €724,500 | €708,750 | €630,000 |
| Under-absorbed in total | €80,300 | €96,050 | €174,800 |
| of which idle or volume part | €63,000 | €78,750 | €157,500 |
| of which spending variances | €17,300 | €17,300 | €17,300 |
The total overhead is €804,800 in every column. The denominator moves cost between product and period; it cannot change how much there was.
What the table makes visible is that the statutory accounts and a good management model will not agree, and should not be forced to. A model priced on practical capacity puts €2.50 less fixed cost on every line hour than the IAS 2 ledger does, €78,750 across the 31,500 hours this year. That gap is a reconciling item with a name, the difference between normal and practical capacity, and I would show it as one line in the bridge between the management report and the financial statements rather than let either side adjust its rate to match the other.
What the denominator does to next year
The size of this year’s adjustment is not the strongest reason to prefer practical capacity. The reason is next year’s rate. A plant that plans 32,000 hours after a slow year and keeps budgeted volume as the denominator sets a fixed rate of €630,000 over 32,000, about €19.69 per hour. Every quote goes up, some customers go elsewhere, the following plan is lower again, and the rate climbs with it: the death spiral of traditional costing. On practical capacity the rate stays at €15.00 until the line itself changes, and the cost of the empty hours is reported where someone can decide what to do with them: sell the time, cut a shift, or accept the cost knowingly.
Normal capacity sits between the two. It moves slowly, because it is an average of several years, and that is what makes it a sensible basis for inventory: it stops a bad year inflating stock without letting a company value stock on an optimistic capacity it never reaches.
From here to time-driven costing
The practical-capacity calculation is the first equation of time-driven activity-based costing, as Robert Kaplan and Steven Anderson described it in 2004, written in minutes instead of hours. 42,000 line hours is 2,520,000 minutes, and €630,000 over 2,520,000 is €0.25 per minute. A job that takes 75 minutes of the line carries €18.75 of fixed overhead whatever the rest of the year looks like, and the minutes nobody used, valued at the same rate, are the cost of unused capacity: the €157,500 above, for one line.
What time-driven costing adds is the time equation, which replaces a flat count of line hours with the minutes each order actually takes given its characteristics: changeovers, pack format, run length. The unused capacity can then be read by product and by customer rather than as one departmental figure. The discipline underneath is the one this exercise teaches. Set the rate on what the resource can do, charge each job for what it used, and keep idle capacity out of unit costs.
If you are here for an exam
Under-absorbed overhead is actual overhead minus applied overhead, where applied is actual activity times the predetermined rate. Over-absorbed is the reverse. Split it into the fixed spending variance (actual fixed minus budgeted fixed), the variable spending variance (actual variable minus actual hours times the budgeted variable rate) and the volume variance (denominator hours minus actual hours, times the fixed rate). The three must add back to the total. Then say which denominator the rate used, because the volume variance is entirely a product of that choice.
Sources
- IAS 2 Inventories, paragraphs 12 and 13, in the text issued by New Zealand’s External Reporting Board as NZ IAS 2. standards.xrb.govt.nz
- 26 CFR 1.471-11, Inventories of manufacturers, paragraph (d)(4), practical capacity concept. law.cornell.edu
- Cost Accounting Standard 418, 48 CFR 9904.418-50, paragraph (g), use of preestablished rates for indirect costs and disposal of variances. law.cornell.edu
- Federal Accounting Standards Advisory Board, SFFAS 4, Managerial Cost Accounting Standards and Concepts (1995), paragraphs 258 to 263, unused capacity costs. files.fasab.gov
- Robert S. Kaplan and Steven R. Anderson, “Time-Driven Activity-Based Costing”, Harvard Business Review, November 2004. hbr.org
Related reading: practical capacity, capacity cost rate and cost of unused capacity in the glossary, capacity costing, practical capacity by function, IAS 2, normal capacity and inventory cost, marginal versus absorption costing and time-driven activity-based costing.