A cleaning contract is priced per square metre per month, and a square metre is not a unit of cost. The cost is minutes of a cleaner’s time, and the minutes depend on the frequency, the standard, the layout and, above all, on what the client asks for after the contract is signed. In facility management the contract that starts at a healthy margin and ends the year losing money has usually not had its price cut. It has had its scope grown, one small request at a time, none of them priced, until the extras have eaten the contribution. This article builds an invented office contract, prices it per square metre by frequency, adds six ordinary extras, and shows where the margin went. Then it shows what the renewal negotiation looks like with and without the numbers. The client, the building and every figure are invented and labelled as such.

The short version

How does a facility management contract go from profitable to loss-making without a price change, and how is cost per square metre by frequency computed?

Cost per square metre is minutes per square metre at the cleaner’s capacity cost rate, and minutes depend on frequency. In the invented 12,000 square metre office cleaned five days a week at 300 square metres an hour, labour is 40 hours a day, 860 hours a month, 16,512 at 19.20 an hour; with supervision, consumables, equipment and travel the cost is 18,033.50 against a price of 21,600 at 1.80 per square metre, a contribution of 3,566.50 or 16.5 percent. Labour alone is 1.376 per square metre per month at five days a week, 0.826 at three, 0.275 at one. Six extras arrive over the year, none of them priced: meeting rooms after events, internal glass, weekly quality reports, kitchens twice a day, absence cover at agency rates and key-holding callouts. Together they cost 1,109.80 a month, 31 percent of the contribution, and take it to 2,456.70 or 11.4 percent. At renewal the client asks for 5 percent off; at 20,520 the contribution is 1,376.70, 6.7 percent, and the next extra takes it below zero. The price per square metre never changed. The scope did.

What a square metre costs, by frequency

The unit the contract is written in is the square metre. The unit the cost is incurred in is the minute. The bridge between them is productivity, square metres per hour at the agreed standard, and the frequency, how many times a month those square metres are cleaned. Everything else in the contract’s cost follows from those two numbers and the capacity cost rate of the people doing the work.

The invented building: 12,000 square metres of open-plan office, meeting rooms, kitchens and sanitary areas, cleaned five evenings a week. Productivity at the agreed standard is 300 square metres an hour, a blended figure across the areas, so a day’s clean is 40 hours of cleaner time. At 21.5 working days a month that is 860 hours, or 51,600 minutes. The cleaners’ capacity cost rate, wages, employer contributions, paid leave and the hours that cannot be sold, comes to 19.20 an hour, 0.32 a minute. Labour is 16,512 a month.

Frequency changes the cost in proportion, which is why the table below is the first thing a pricing conversation needs. Labour per square metre per month is 1.376 at five days a week, 0.826 at three days, 0.275 at one day. A client who asks what a reduced frequency would save is asking for the second line, and a contractor who can answer it in the meeting has a different negotiation from one who has to go away and think.

Frequency, invented building Hours a month Labour a month Labour per square metre per month
Five days a week 860 16,512.00 1.376
Three days a week 516 9,907.20 0.826
One day a week 172 3,302.40 0.275

The contract as signed

The price is 1.80 per square metre per month, 21,600. The cost, beyond the labour, is four lines that a contract like this carries: supervision, a supervisor’s half hour a day at 26 an hour, 279.50; consumables at 0.06 per square metre, 720; equipment depreciation and maintenance, 350; travel between sites, 8 a day, 172. Total cost 18,033.50. Contribution 3,566.50, which is 16.5 percent of the price, before the contractor’s own overhead. On the day it is signed, this is a good contract.

Six extras, none of them priced

Over the first year the client asks for six things, each reasonable, each small, each agreed by the site supervisor or the account manager because refusing would have been awkward and the amount seemed trivial.

The meeting rooms are used for events twice a week and need a clean afterwards, outside the evening round: about two hours each time, 12 hours a month, 230.40. The internal glass partitions, not in the specification, get done monthly because the client mentioned them: 8 hours, 153.60. The client’s facilities manager asks for a weekly quality report with photographs, which the supervisor writes: an hour a week, 4.3 hours a month at 26, 111.80. The kitchens, cleaned once in the evening round, are asked to be done at lunchtime too: half an hour a day, 10.75 hours, 206.40. When a cleaner is absent, the client insists on full cover the same day, which means an agency cleaner at 29.50 an hour instead of 19.20: four days a month, 32 hours, 10.30 an hour extra, 329.60. And the site’s alarm goes off twice a month at night, and the contractor holds the keys, so a supervisor attends: an hour and a half each, 78.00.

Extra, invented Hours a month Rate Cost a month
Meeting rooms after events 12 19.20 230.40
Internal glass, monthly 8 19.20 153.60
Weekly quality report 4.3 26.00 111.80
Kitchens at lunchtime 10.75 19.20 206.40
Absence cover at agency rates 32 10.30 premium 329.60
Key-holding callouts 3 26.00 78.00
Total 1,109.80

Together, 1,109.80 a month. That is 0.092 per square metre on a contract priced at 1.80, which is why nobody noticed: each extra is a rounding error on the price. It is also 31 percent of the contribution. The contract now contributes 2,456.70, 11.4 percent, and the price has not moved.

The renewal

At renewal the client’s procurement team, doing its job, asks for 5 percent off, on the grounds that the market has moved and the relationship is good. The account manager, who does not have the table above, knows the contract “is profitable” and agrees. The price becomes 20,520. The contribution becomes 1,376.70, 6.7 percent. The next extra, the next absence spike, the next request for a deep clean before an audit, takes it below zero, and the contract that was signed at 16.5 percent is being run at a loss two years later by a team that never saw a single number change by more than a few hundred a month.

With the table, the renewal is a different conversation. The contractor can show that the specification being delivered is not the specification that was priced: six additional services, 1,109.80 a month, itemised, at cost. The price to keep the original 16.5 percent on the delivered scope would be about 1.91 per square metre, not 1.80 and not 1.71. And the client, who may genuinely not have known that the lunchtime kitchens and the quality reports were outside the contract, can choose: pay for the extras, stop some of them, or accept a frequency change that funds them, three days a week on the open-plan floors saving a quarter of the labour. This is the renegotiation dossier in a specific industry, and the behaviour price, the cost of each extra, is the instrument.

Why facility management is prone to this

Three reasons, and they are structural. The service is delivered on the client’s premises by the contractor’s staff, who are asked for things directly and daily by people who are not the client’s buyer, so scope grows at the point of delivery rather than through a change order. The unit of price, the square metre, is fixed at signature and visible, while the unit of cost, the minute, moves invisibly. And the margins are thin enough that a scope creep of a few percent of price is a third of the contribution, which is not true in industries priced at 40 percent gross margin. The cost-to-serve logic, that the same revenue can carry very different costs depending on how the customer behaves, is the whole economics of this industry, and the behaviours are the extras.

The model that catches it

The model is small. One pool for cleaner time with its capacity cost rate, one for supervision, and a time equation per contract: base minutes from square metres, productivity and frequency, plus a term for each service outside the base, with the hours logged. The logging is the hard part and the only part that matters: every extra is recorded on the day it is done, by the supervisor, in minutes, against the contract. Not priced, not approved, just recorded. At the end of each month the model shows, per contract, the base cost, the extras cost and the contribution, and at the end of each quarter the account manager sees which contracts have drifted. The extras are then priced, waived knowingly, or stopped, but they are no longer invisible. This is the same discipline as the cost per order, line and complaint in distribution: name the behaviour, measure it in minutes, and put a cost on it before the renewal, not after.

The price per square metre never changed. Six small favours did. A contract that is not measured in minutes is repriced by the client every week and by the contractor every two years.

Where this goes wrong

Productivity set from the tender, at the rate that won the bid, rather than from the building as cleaned, so the base cost is understated from the first month and the extras land on a margin that never existed. Absence cover costed at the standard rate because “we always cover”, so the agency premium, in the invented case the largest single extra, disappears into the payroll variance. Extras recorded as goodwill rather than as minutes, which means they are recorded nowhere. Or the model built at group level with an average productivity across all buildings, which hides the fact that this building, with its glass, its kitchens and its events, runs at 250 square metres an hour and not 300. Each of these makes the contract look fine until the year it is not.

Where to start

Take the ten largest contracts and, for each, the price, the base specification and the hours actually worked last month from the timesheets. Compute the base hours from square metres, productivity and frequency, and the difference is the extras, whether or not anyone has written them down. Rank the ten by the difference as a share of contribution. The top of the list is the renewal to prepare first, with the table in hand. The true cost of a discount is what the 5 percent at renewal actually costs on a contract already carrying its extras, and the profitability approach for smaller companies is the scale most contractors in this industry work at.

Related reading: how to calculate cost to serve, the hidden cost of complexity, should-cost for procurement and five customer families by cost-to-serve profile.