There is a puzzle at the centre of the last forty years of costing, and the Canadian academic Maurice Gosselin gave it a name: the ABC paradox. Activity-based costing was, by the evidence of the case studies and the experiments, a better way of costing products and customers than the volume-based systems it was meant to replace. The distortions it corrected were real and often large. And yet, when researchers went out and counted, the adoption rate was low, a good share of the firms that had adopted it had stopped using it within a few years, and many of the rest had kept the model but not the practice. A method that was demonstrably better was, in the aggregate, rejected. I have spent much of my working life inside that paradox, on both sides of it, and this article is an attempt to say what the adoption literature found and what I think it means for anyone building a cost model today.

At a glance

Why was activity-based costing abandoned by so many companies if it was a better method?

Because being a better method was not enough. The adoption research of the 1990s and 2000s found that ABC systems were expensive to build, more expensive to maintain, dependent on staff surveys that went stale, and often disconnected from the decisions they were supposed to inform. Adoption was shaped less by the quality of the method than by organisational factors: senior sponsorship, whether the finance and operations people cooperated, whether the numbers were tied to anything anybody was measured on, and whether the organisation’s structure and strategy made it able to act on what the model showed. Gosselin’s contribution was to separate adoption from implementation, and to show that the firms most likely to adopt the idea were not the firms most likely to see it through.

What Gosselin called the paradox

Gosselin’s best-known study, published in the late 1990s in Accounting, Organizations and Society, looked at how a firm’s strategy and its organisational structure affected whether it adopted activity-based approaches and, separately, whether it implemented them. That separation is the heart of his contribution. He distinguished levels of activity management, from a simple analysis of what activities a firm performs, through costing those activities, to a full ABC system that assigns activity costs to products, and he treated the decision to adopt and the act of implementing as two different events with different drivers. His later review of the field, in the 2000s, is where I first saw the phrase “ABC paradox” used for the gap between the method’s demonstrated merit and its actual uptake.

The finding I have found most useful in practice is the one about structure. In his data, the organisations more inclined to adopt activity-based approaches were the ones with an outward-looking, innovative strategy, but the organisations more likely to implement a full ABC system were the more formalised and centralised ones. The firms attracted to the idea and the firms able to execute it were, to a meaningful degree, different firms. Anyone who has watched an innovative, decentralised company start an ABC project with enthusiasm and quietly drop it two years later will recognise the pattern.

What the adoption research measured

Gosselin did not work alone, and the paradox is visible across a body of survey and field research from the mid-1990s onward. I will describe its shape rather than its numbers, because the figures vary by country, by year and by how the question was asked, and I do not want to quote a percentage I cannot stand behind.

Surveys of large firms in the United Kingdom by John Innes and Falconer Mitchell, repeated across the decade, found adoption in a minority of firms and, on the repeat survey, a visible group that had adopted ABC and since rejected it. Michael Shields, in the United States, found that the success of an ABC implementation was explained far better by behavioural and organisational variables, top management support, links to performance evaluation and compensation, training, ownership by non-accountants, than by technical ones such as the software used or the number of drivers. Studies in Finland by Teemu Malmi and elsewhere in Scandinavia looked at what happened after adoption and found that the models were often kept running for reasons that had little to do with their stated purpose. Shannon Anderson’s field work inside a large American manufacturer described implementation as a sequence of stages, each with its own failure modes, and Kip Krumwiede’s survey work extended that stage view to a wider population. And Kaplan and Anderson themselves, when they introduced time-driven ABC in 2004, opened by acknowledging that many ABC systems had been abandoned, and gave the reasons this article is about.

The consistent picture across all of that is not that ABC was tried and found wanting on its merits. It is that it was tried, worked as a calculation, and then failed as an organisational practice.

Five explanations, and how much weight each deserves

The cost of building it. A 1990s ABC project meant interviewing or surveying most of the indirect workforce about how they spent their time, defining an activity dictionary that could run to hundreds of entries, and building a model with more cost pools than the accounting system had accounts. It was a large project and it was usually done by consultants. That explanation is true but, I think, the least important, because plenty of expensive projects are completed and kept.

The cost of keeping it alive. This one matters more. A survey-based model is accurate on the day the survey is taken and drifts from then on. Re-surveying is expensive and annoying, so it is postponed, so the model goes stale, so people stop trusting it, so it is not re-surveyed. Every abandoned ABC system I have personally seen died this way. The question of how often a cost model should be updated was, for the 1990s generation, the question that killed the model.

Resistance. An accurate cost model changes who looks good. Products, customers, plants and sales regions that were profitable under the old allocation turn out not to be, and the people responsible for them have every incentive to argue with the model rather than with the result. Shields’s finding that success depended on linking the numbers to evaluation and compensation is, read the other way, a finding that a model with no such link can be ignored at no cost to anyone. The five objections before a profitability project article is a catalogue of the forms that resistance takes.

Fit with strategy and structure. This is Gosselin’s specific contribution and I think it is under-appreciated. A cost model is only worth maintaining if the organisation can act on what it shows, and acting on a customer profitability result means changing prices, service levels or terms, which requires the commercial side of the business to accept a number produced by finance. Organisations differ enormously in whether that is possible. A decentralised firm where each unit sets its own prices may adopt the idea and be structurally unable to execute the consequences. A centralised one may be slow to adopt and effective once it does.

The numbers were not connected to a decision. The quietest failure, and in my experience the most common. The model was built, it produced a profitability report, the report was circulated, and nothing in the company’s decision processes required anyone to use it. Pricing continued on cost-plus from the old standard cost; the sales incentive stayed on revenue; the budget was built on last year’s allocation. A cost model that no decision depends on is not abandoned so much as never adopted, whatever the survey says. The article on cost data in pricing decisions is about closing that gap deliberately.

What Kaplan and Anderson conceded

It is to Kaplan’s credit that the paradox was acknowledged by the method’s principal author rather than only by its critics. The 2004 article on time-driven ABC is, in its opening, an admission that the first-generation approach had been too hard to build, too hard to maintain and too dependent on subjective surveys, and that many firms had given up on it for those reasons. Time-driven ABC was designed as an answer to the maintenance problem specifically: two parameters per resource pool instead of a survey, time equations that can be updated when a process changes without re-interviewing anyone, and unused capacity reported rather than hidden. Whether it fully answered the paradox is a question I take up in a separate article. My short view is that it solved the maintenance problem and left the organisational ones exactly where Gosselin had found them.

What the paradox looks like in 2026

Three things have changed and two have not. The data is now mostly available without surveys: the ERP, the warehouse system and the ticketing tool carry the transaction counts and, increasingly, the timestamps a model needs, so the maintenance burden that killed the 1990s systems has largely gone for anyone willing to do the plumbing. The software is cheaper and the modelling is faster; a first model in a month is a reasonable expectation rather than an aspiration. And the language has shifted from product costing to cost to serve and customer profitability, which puts the model closer to the commercial decisions it needs to influence.

What has not changed is the organisational half. A model still changes who looks good, and the commercial side of a company is still, in most cases, not obliged to use it. And the governance problem, who owns the model in year three, is as unsolved as it was; if anything, faster model-building has made it easier to build a model nobody owns. The costing model that died is a composite of the ways I have watched that happen recently, not in the 1990s.

What I take from it

Start from the decision, not from the method. Before building anything, identify the two or three decisions the model has to change, who makes them, and what would have to be true for them to accept a number from finance. If the answer is that nothing would make them accept it, the project is not a costing project and should not be started as one. Design for maintenance from the first day: drivers from systems, not surveys; a named owner; a refresh cadence written down. Tie at least one number the model produces to something somebody is measured on. And read Gosselin before reading Kaplan, because the paradox is not a footnote to the method; it is the reason the method has to be applied differently in different organisations. The cost model governance article and the twenty-minute meeting with the CFO are the practical versions of this advice.

The method was not the problem. The organisations that most wanted a better cost model were, quite often, the ones least able to act on one.

What I have checked and what I have not

I am confident of the authors named here and of the broad shape of what each found: Gosselin on strategy and structure, Innes and Mitchell on UK adoption and rejection, Shields on behavioural factors, Malmi on post-adoption behaviour, Anderson and Krumwiede on implementation stages. I have deliberately not quoted adoption or abandonment percentages, because the figures differ by study and I would not want a number I have not re-read to be cited from this page. Where I have given a decade rather than a year, that is the reason. The description of what Kaplan and Anderson conceded in 2004 is my paraphrase of the article’s opening argument, not a quotation. A student should treat this as a map of the literature and go to the papers themselves.

Related reading: Relevance Lost, nearly forty years on, why costing models fail after go-live, the intellectual lineage of costing and activity-based costing.