Skip to content
Methods · Comparison

Eleven costing methods, one table: precision, effort, maintenance and fit

Quick answer. Traditional volume-based costing, activity-based costing, time-driven ABC, GPK, resource consumption accounting, throughput accounting, standard costing, target costing, kaizen costing, lean accounting and the UEP method answer different questions and cost different amounts to run. The table below scores each one on the same six criteria, so you can see in one screen which method fits the decision you have to make, what it will take to build, and what it will take to keep alive.

Most comparisons of costing methods argue for one of them. This one does not. Each method on the list survives because it answers a question well, and each one is wrong for the questions it was not built to answer. A factory choosing between product designs needs target costing; a distributor asking which customers lose money needs cost-to-serve, which today means TDABC; an auditor valuing inventory needs standard or absorption costing and is entitled to nothing else.

The scores are our assessment, from building and rescuing these models in mid-sized, multi-product businesses. They are not published benchmarks and there is no study behind them; where a method is used in a very different setting, the score moves. The one-line profiles below the table say what each method optimises for, and the method profiles go into the mechanics.

01The table

Six criteria, applied uniformly

Precision is how close the method gets to the cause of a cost at the level it reports (product, customer, order, process). Implementation effort is what it takes to stand the model up the first time. Maintenance is what it takes to keep it true a year later. Best and worst case are the settings in which each method earns or loses its keep. Tools are what people actually run it on.

Scale: ●●●●● high, ●○○○○ low. For precision, more is better. For effort and maintenance, more means heavier: a five is a programme, a one is a spreadsheet afternoon.

MethodPrecisionImplementation effortMaintenanceBest use caseWorst use caseTypical tools
Traditional costingVolume-based absorption●○○○○●○○○○●○○○○One or two products, overhead small next to direct cost, statutory inventory valuation.Many products or customers of very different complexity; the average silently subsidises the difficult ones.ERP costing module, general ledger, spreadsheets.
Activity-based costingABC, two-stage●●●●○●●●●●●●●●●A one-off diagnosis of where overhead really goes, in a business that will act on the answer once.A living model refreshed every period: the interviews and percentage splits that built it decay, and nobody redoes them.Dedicated ABC engines, spreadsheets for small models, older enterprise profitability suites.
Time-driven ABCTDABC●●●●○●●●○○●●○○○Cost-to-serve and customer or order profitability in businesses with transactional data: distribution, logistics, services, healthcare.A single-product plant where minutes barely vary between units, or a business with no transaction records to drive the time equations.TDABC platforms such as CostCtrl, spreadsheets for a pilot, BI on top for reporting.
GPKGrenzplankostenrechnung●●●●○●●●●●●●●●○Large manufacturers with hundreds of cost centres that want planned versus actual by centre and a contribution-margin income statement.A small or service business: the cost-centre architecture is the point, and it does not pay for itself below a certain size.ERP cost-centre accounting in the German tradition (SAP CO is built on it), planning tools.
Resource consumption accountingRCA●●●●●●●●●●●●●●○Capacity-heavy operations that need fixed and proportional cost separated by resource and idle capacity reported by pool.Anywhere the organisation will not maintain quantity-based resource data every period; RCA without the quantities is GPK with more work.Specialist implementations on top of ERP cost-centre modules; few packaged tools.
Throughput accountingTheory of Constraints●●○○○●○○○○●○○○○Short-run product mix and scheduling decisions at a known bottleneck, where operating expense really is fixed for the decision.Pricing, customer profitability or any decision with a horizon long enough for capacity to change; it refuses to allocate on purpose.Spreadsheets, scheduling tools, the production planning module.
Standard costingPredetermined cost and variances●●○○○●●●○○●●●○○Repetitive manufacturing with stable bills of material, inventory valuation, and control by variance of the direct costs.Overhead-heavy or service businesses, and any attempt to read customer profitability off a standard that was set for the average.ERP standard costing module, bill of materials, routing data.
Target costingGenka kikaku●●●○○●●●○○●●○○○New product development where price is set by the market and cost has to be designed in before the tooling is cut.Costing what already exists: it is a design-stage discipline, and it borrows its precision from whichever cost model sits underneath it.Product lifecycle and cost-estimating tools, spreadsheets, the underlying cost model.
Kaizen costingContinuous cost reduction●●●○○●●○○○●●●○○Products already in production, in a plant with a culture of small, measured improvements and a target reduction per period.Deciding what to make or whom to serve; it manages the cost of a given design and says nothing about whether the design should exist.Shop-floor tracking, ERP actuals, improvement logs, spreadsheets.
Lean accountingValue-stream costing●●○○○●●○○○●●○○○A plant organised in value streams with dedicated resources, where the stream is the decision unit and product-level cost is not needed.Shared resources across streams, or any question that needs cost per product or per customer inside the stream.Value-stream box scores, simple ledgers, spreadsheets.
UEP methodProduction effort unit●●●○○●●●●○●●●○○Multi-product factories with a stable set of work stations, where a single unit of effort can measure every product through the plant.Anything outside the factory: selling, distribution and service cost do not pass through a work station and the method has no place for them.Custom implementations, spreadsheets, a few regional packages in Brazil and France.

Scores are our assessment for a mid-sized, multi-product business, not measurements. Effort and maintenance grow with the number of products, customers and cost centres, whichever method you choose.

02At a glance

The same three scores, as numbers

For anyone building a shortlist. Precision from one to five, higher is closer to the cause. Effort and maintenance from one to five, higher is heavier. The last column is the question each method was built to answer, which is usually the fastest way to rule one in or out.

MethodPrecisionEffortMaintenanceThe question it answers
Traditional costing111What does a unit cost, on average, for the accounts?
Activity-based costing455Where does overhead really go, product by product?
Time-driven ABC432What does each customer, order and process cost, this period, and what capacity is idle?
GPK454Is each cost centre on plan, and what is the contribution margin by product line?
Resource consumption accounting554Which resources are consumed, in what quantity, and what is fixed versus proportional?
Throughput accounting211Which mix maximises throughput at the bottleneck this week?
Standard costing233Did direct costs come in as planned, and why not?
Target costing332What must this product cost to earn its margin at the market price?
Kaizen costing323Did this period's cost of the product fall by the amount we committed to?
Lean accounting222Is the value stream, as a whole, making money and improving?
UEP method343How much of the factory's effort does each product absorb?
03Method by method

What each one optimises for, and the trade it makes

Traditional costing

One or two overhead rates, spread on volume: labour hours, machine hours, revenue. Cheap, auditable and exactly right when overhead is small and products are alike. The trade is that every product or customer is charged as if it were average, so the complex ones are undercharged and the simple ones pay for them. This is the overhead allocation problem in one sentence.

Activity-based costing

Trace overhead to activities, then activities to products on the driver that causes them. The precision gain over volume-based costing is large and well documented. The trade is the build and the upkeep: the activity dictionary, the interviews, the percentage splits of people's time, all of which are stale within a year. Most ABC models that died did so of maintenance, not of error.

Time-driven ABC

Two parameters per resource group, a capacity cost rate and a time equation, driven by transaction data that already exists. It keeps most of ABC's precision, drops most of its maintenance and reports unused capacity as a line of its own. The trade is that it needs transactional data: no order, line, drop or ticket records, no model.

GPK

The German cost-centre discipline: every centre has a planned quantity of output, a fixed and a proportional cost, and a monthly plan-versus-actual. It produces the cleanest contribution-margin income statement of any method here. The trade is architecture: hundreds of centres, quantities for each, and a controlling function large enough to keep them honest.

Resource consumption accounting

GPK's resource view with ABC's activity view, on quantities rather than money, with the fixed and proportional nature of each cost carried through to the product. The most causally faithful method on the list and the most demanding of data. The trade is that the quantities have to be maintained every period, and if they are not, the model degrades into something less than GPK.

Throughput accounting

Revenue minus truly variable cost is throughput; everything else is operating expense and is not allocated at all. Built for the constraint: which product earns the most throughput per minute of the bottleneck. It is honest about what it refuses to do, and the trade is that a business run on throughput alone never learns what its customers or its complexity cost it.

Standard costing

Predetermined material, labour and overhead costs per unit, with the difference to actuals explained as variances. It is the backbone of manufacturing ERP and of inventory valuation, and for direct cost control it is hard to beat. The trade is the overhead standard, which is a volume-based average with a formal name, and which drifts between annual reviews.

Target costing

Start from the market price, subtract the required margin, and design the product to the cost that remains. A management process more than a measurement method, and the one that most changes what a company decides to make. The trade is that it only works before the design is frozen, and it inherits its precision from whatever cost model estimates the design.

Kaizen costing

Target costing's sibling for products already in production: a cost-reduction target per period, pursued through small improvements, measured against actuals. Cheap to run where the shop floor already tracks its numbers. The trade is scope: it lowers the cost of what exists and has no view on whether the product, the customer or the process should exist.

Lean accounting

Cost the value stream, not the product: dedicated people, machines and space per stream, a box score of operational, capacity and financial measures, no allocations across streams. Simple and well matched to a lean plant. The trade is that it works only where resources are genuinely dedicated, and it gives no answer at product or customer level inside the stream, which is where pricing questions live. There is no profile of it on this site yet; the glossary entry is the short version.

UEP method

Define one unit of production effort, weight every work station in it, and measure every product as a number of units through the plant. It turns a multi-product factory into a single-product one for costing purposes, elegantly. The trade is the boundary: the method lives inside the factory walls and has nothing to say about the cost of selling, delivering or serving what the factory made.

04Choosing

Start from the decision, not from the method

  1. Which customers, orders or channels lose money? Cost-to-serve, which means TDABC. ABC will get there once; it will not get there every quarter. Nothing else on the list answers this at all.
  2. What should this new product cost? Target costing, with kaizen costing to take over after launch. The cost model underneath can be standard costing or TDABC; the discipline is the same.
  3. Are direct costs under control? Standard costing and its variances. This is what it is for, and a TDABC model does not replace it; the two coexist, as the standard versus actual comparison explains.
  4. Is each department on plan? GPK, or RCA if you also need fixed and proportional cost separated by resource and can maintain the quantities.
  5. What do we run through the bottleneck this week? Throughput accounting, for that decision and no other.
  6. Is the plant improving, stream by stream? Lean accounting, if the streams are dedicated. If they share resources, you are back to one of the allocation methods.
  7. How much effort does each product take through the factory? UEP, if the plant is stable enough for the unit to hold, or TDABC time equations per work station if it is not.
  8. What does the auditor need? Absorption costing for inventory. Do not let this decide the management model; the two questions are different, and forcing one method to answer both is how most costing systems end up answering neither.
05Combinations

Pairs that work, and one that does not

Standard costing plus TDABC. The most common pairing in manufacturing that also sells to many customers: standards for material and labour control and inventory valuation, TDABC for the cost of orders, customers and service. The ledger reconciles to both, and each answers the question the other cannot.

Target costing plus kaizen costing. The original Japanese sequence: design to a cost, then keep reducing it. One hands over to the other at launch.

GPK plus RCA. RCA is GPK extended, so the pairing is really a migration path: a controlling function that runs GPK well can add resource quantities and fixed-proportional splits pool by pool.

Lean accounting plus throughput accounting. Both refuse to allocate, both think in flows, and a lean plant with a known constraint can run its value-stream box score and its bottleneck decisions on the same worldview.

ABC plus a monthly refresh. This is the one that does not work, and it is the reason TDABC exists. A model built on interview percentages cannot be refreshed monthly at any reasonable cost, so it is refreshed annually, then never. The TDABC versus ABC comparison and why costing models fail after go-live both walk through the mechanism.

06FAQ

Fair questions.

Which costing method is the most accurate?
For causal fidelity, resource consumption accounting, followed by TDABC, ABC and GPK, which sit close together. But accuracy is only worth what it costs to maintain: an RCA model that nobody updates is less accurate a year later than a TDABC model that refreshes itself from transaction data every month.
Is TDABC a replacement for standard costing?
No. Standard costing controls direct costs and values inventory; TDABC costs work and reports unused capacity. Most manufacturers that sell to many customers run both, and reconcile both to the same ledger.
Why does ABC score so heavily on maintenance?
Because its activity rates come from interviews and percentage splits of people's time, which have to be redone to stay true, and in practice are not. TDABC replaced the interviews with time equations driven by data the systems already record, which is the whole difference in upkeep.
Where do lean accounting and throughput accounting fit if they do not allocate?
They answer flow questions: is the stream improving, what goes through the constraint. They are deliberately silent on product and customer cost. Use them for those questions and one of the allocation methods for the others; forcing either to price a customer produces a number with no cause behind it.
Can a small company use any of these?
Yes. Traditional costing, throughput accounting and a spreadsheet TDABC pilot all fit a small business. GPK, RCA and full ABC do not, because their cost is in the architecture rather than the arithmetic. The profitability for SMEs profile is the practical version of this answer.
Methods series

Not sure which of the eleven your situation needs?

The Profit Check scores how your cost model is built today and points at the method that would move the number.

Duration
10 minutes
You receive
Score, 7 dimensions, sector benchmark
We ask for
Name, organisation, work email, industry, size
Cover of the video: how to calculate cost to serve in five stepsRelated video · 2 min 34How to calculate cost to serve in five stepsThe five TDABC steps, one wholesale example and the break-even in minutes.Watch the video and read the transcript →

Proof

A distributor in New Zealand. €1.335M of cost-to-serve made visible, then halved, and 830 loss-making customers brought down to 295.

Read the case study →

Who you would be talking to

Miguel Guimarães, Founding Partner

Cost and profitability practitioner for 25+ years. Presented the Damco cost-to-serve case at Managing for Profit (Amsterdam RAI, December 2009), on the same programme as Robert S. Kaplan.

Call +351 910 313 731

Workshops

Bring the method into the room.

One working profitability model, built from real data, that you take home at the end.

Reserve a seat
Miguel Guimarães

Reviewed by

Miguel Guimarães

Founding Partner, Cost and Profitability Consulting

Time-Driven ABC engagements since 2010, working within the Kaplan and Anderson framework.

About the author →

Published

M
Ask us anything
usually replies in minutes
Hi. I can answer the quick questions about cost, method and timing right here. For anything specific to your business, I'll connect you with a CostCtrl specialist on WhatsApp.
No bot loops. Straight to a specialist.
Most read
  1. 1Time-driven activity-based costing: ABC made simple and scalable
  2. 2Whale Curve: Definition, How to Build One, Live Simulator
  3. 3Cost-Volume-Profit (CVP) and Break-Even Analysis
  4. 4How to calculate cost to serve, step by step
  5. 5Cost-to-Serve Analysis
  6. 6Make-or-Buy and Relevant Costs
  7. 7TDABC vs ABC: same goal, very different effort
  8. 8Pocket Price Waterfall and Price Realization
  9. 9Transfer Pricing for Internal Profitability
  10. 10Cost-to-Serve, Profitability and AI: Executive Workshop Porto - November 27, 2026