Skip to content
Video · Illustrative case · 4 min 05

Cost to serve in a city-owned bus company: an illustrative case (video)

A city-owned bus company, paid by the city per kilometre, rebuilt as a cost to serve model: $418 million of revenue, 3 depots, 112 lines and an operating result of 2.84%. Two lines receive the same $9.60 a kilometre: one earns $2.50 a kilometre and the other loses $2.90. After all cost, feeder lines end at -12.4%, school and event services go from 85.5% after energy to -7.9% after serving, and 31 of the 112 lines end below zero. Then a simulation with rules set beforehand: running every line from its nearest depot cuts dead running from 15% to 9% of the kilometres and adds $3.21 million a year, from 2.84% to 3.61% of revenue, and two further initiatives release 16,000 hours a year, the work of 13 people, without redundancies.

Illustrative case: a fictitious company, figures created to simulate the model. 4 min 05. Also on YouTube.
Take the Profit Check

Fourteen questions and the full result on screen, after your name, organisation, work email, industry and size. If you already trust your margin by customer, you do not need it.

Full transcript

Illustrative case: a fictitious company, figures created to simulate the model.

0:00The city pays two bus lines the same for every kilometre. They do not cost the same to run. $418 million of revenue, in one year. An illustrative case: a city-owned bus company, rebuilt as a cost to serve model.

0:193 depots and 112 lines, in a single model. 30 activities carry every cost to the trip. The figures were created for this case. The structure is that of a real model.

0:34Here is the year, line by line. The operating result comes to 2.8% of revenue.

0:45The heart of the model is the minute. In time-driven costing, a minute costs what the resource costs, divided by its capacity. From 52 cents to $1.38 a minute, depending on the resource.

1:01At 11 kilometres an hour, a kilometre takes twice the driver time it takes at 21. This is not a flaw of the company. It is the shape of the sector. In city bus service, the city pays per kilometre. The cost comes from speed, from kilometres run empty, and from the depot.

1:21In the model, two lines receive the same $9.60 a kilometre. One earns $2.50 a kilometre. The other loses $2.90.

1:33Four kinds of line, with similar margins after energy. After all cost, feeder lines end at -12.4%. Fewer than one trip in ten, and 27% of the kilometres run empty.

1:49School and event services keep 85.5% after energy, and end at -7.9% after serving. And 31 of the 112 lines end below zero.

2:03This case uses created figures. Yours would use your own systems. The ledger says what was spent. Vehicle location, ticketing, rostering and the workshop say what was done. Activity-based costing joins the two, and every figure leads back to the ledger.

2:22Simulate and recalculate. The agent never types a number into the P&L. It changes inputs. The engine computes the consequences, and every figure carries the rule that produced it.

2:36First, the rules, written before any idea: the timetable held, no redundancies, coverage and safety held. Three shortcuts break a rule: close the feeder lines, cut drivers, or run the weakest lines half as often. Three initiatives keep them all: every line run from its nearest depot, less driver waiting between duties, and buses serviced at night. The first is measured in dollars. The other two release time.

3:08What if every line ran from its nearest depot, and dead running fell from 15 to 9% of the kilometres? Three activities change: $3.2 million a year more. The operating result rises to $15.07 million. The assumption is stated: the depots have the space, and the timetable holds.

3:33And there is a second gain, which is not money: it is time. Cutting driver waiting between duties releases 9,500 hours a year. Servicing buses at night, outside the timetable, releases another 6,500. The work of 13 people, without hiring or dismissing anyone. See your company’s case in a 30-minute call.

The figures in the video are fictitious: the bus company, its depots and its lines do not exist, and the data were created to simulate the model. The structure (resources, activities, kinds of line and depots) is that of a real cost to serve model. The public sector in writing, with the cost of each service and activity-based budgeting: Government and public sector.

All videos →

The Cost-to-Serve Index

See where you stand on the profitability curve.

The Cost-to-Serve Index is an 8-minute read on how well your business sees the true cost of serving each customer. Take it before a Profit Check, and know your starting point. Your name, company and work email get you the score.

Take the 8-minute Index →8 minutes · name, company, work email · instant score

Proof

A distributor in New Zealand. €1.335M of cost-to-serve made visible, then halved, and 830 loss-making customers brought down to 295.

Read the case study →

Who you would be talking to

Miguel Guimarães, Founding Partner

Cost and profitability practitioner for 25+ years. Presented the Damco cost-to-serve case at Managing for Profit (Amsterdam RAI, December 2009), on the same programme as Robert S. Kaplan.

Call +351 910 313 731

Workshops

Bring the method into the room.

One working profitability model, built from real data, that you take home at the end.

Reserve a seat
Miguel Guimarães

Reviewed by

Miguel Guimarães

Founding Partner, Cost and Profitability Consulting

Time-Driven ABC engagements since 2010, working within the Kaplan and Anderson framework.

About the author →

Published

M
Ask us anything
usually replies in minutes
Hi. I can answer the quick questions about cost, method and timing right here. For anything specific to your business, I'll connect you with a CostCtrl specialist on WhatsApp.
No bot loops. Straight to a specialist.
Most read
  1. 1Time-driven activity-based costing: ABC made simple and scalable
  2. 2Whale Curve: Definition, How to Build One, Live Simulator
  3. 3Cost-Volume-Profit (CVP) and Break-Even Analysis
  4. 4How to calculate cost to serve, step by step
  5. 5Cost-to-Serve Analysis
  6. 6Make-or-Buy and Relevant Costs
  7. 7TDABC vs ABC: same goal, very different effort
  8. 8Pocket Price Waterfall and Price Realization
  9. 9Transfer Pricing for Internal Profitability
  10. 10Cost-to-Serve, Profitability and AI: Executive Workshop Porto - November 27, 2026