Model the process, capture the truth.
The methodology for building a Time-Driven Activity-Based Costing model that captures real complexity and stays maintainable.
What is TDABC Process Design?
TDABC Process Design is the methodology for building a Time-Driven Activity-Based Costing model. It involves mapping your processes into resource groups (cost pools), defining time equations that capture how long each activity takes under different conditions, and connecting this to financial data to produce cost rates.
Good design beats raw detail.
The quality of your TDABC model depends on the quality of its process design. A well-designed model captures real complexity - different customer types, service variants, order characteristics - while remaining maintainable. A poorly designed model is either too simple to be actionable or too complex to sustain.
Where does your organisation stand?
No formal cost model. Costs allocated by simple rules or not at all.
Activity-based model with fixed cost drivers. Doesn't capture process complexity.
Time equations defined for main processes. Model covers major cost pools.
Complete TDABC model with capacity costing, scenario analysis, and regular refresh cycle.
Three moves toward a working model.
Identify all major processes and the resource groups that perform them. Define the scope - which products, customers, and activities are in scope for the first model.
For each process, write a time equation: T = a + b·X1 + c·X2… that captures how time varies with order characteristics, customer type, or service complexity.
Divide the cost of each resource group by its practical capacity. Apply rates to time equations to produce cost-per-transaction for each scenario.
One process, from payroll to cost per order.
Take a customer-service team of six people that handles orders. Its fully loaded cost (salaries, social charges, systems and space) is €270,000 a year.
- Practical capacity. Each person is paid for about 1,760 hours a year; after holidays, training, meetings and breaks, about 1,500 are available for productive work. Six people give 9,000 hours, or 540,000 minutes.
- Capacity cost rate. €270,000 ÷ 540,000 minutes = €0.50 per minute.
- Time equation for order handling. T = 5 + 2 × order lines + 3 if the order is a rush, in minutes.
- A routine order with 3 lines takes 5 + 6 = 11 minutes and costs €5.50.
- A rush order with 12 lines takes 5 + 24 + 3 = 32 minutes and costs €16.00, almost three times as much, from the same team at the same price list.
- Capacity check. In a month with 3,500 orders averaging 12 minutes, the team uses 42,000 of its 45,000 available minutes (540,000 ÷ 12). The 3,000 idle minutes, €1,500, are reported as unused capacity instead of being loaded onto the orders.
Two numbers per process, and the model shows both what each order costs and what the capacity no order used costs.
Overhead, ABC, or TDABC?
| Method | Process Complexity Captured | Scalable Updates | Capacity Visibility |
|---|---|---|---|
| Simple Overhead Allocation | ✕ | ✕ | ✕ |
| Traditional ABC | ✓ | ✕ | ✕ |
| TDABC with Time Equations | ✓ | ✓ | ✓ |