Skip to content
Reference · Model governance

Minimum documentation for a cost model: one page per pool, per driver, per equation

Quick answer. A cost model needs exactly three kinds of document to survive the person who built it: one page for every cost pool, one page for every driver, and one page for every time equation. Each page answers a fixed set of questions in a fixed order, so a controller who has never seen the model can read any number back to its source in minutes. This page gives the three page layouts, the fields that are mandatory on each, a filled example, and a downloadable template.

Most cost models are documented in one of two ways. Either there is a forty-page manual that nobody has opened since go-live, or there is nothing at all and the model lives in the head of the person who built it. Both fail the same test: a new controller cannot explain why a customer carries the cost it carries.

The pattern below is the smallest set of documents that passes that test. It is deliberately boring. Every page has the same headings, the headings never change, and a page that cannot be filled in completely is a page about something the model should not contain yet.

01The principle

Three objects, three page types, nothing else

A time-driven activity-based costing model is built from three kinds of object. A cost pool groups resources that do similar work and turns their cost into a rate per minute of practical capacity. A driver is a field in your data that changes how many minutes a transaction takes. A time equation joins the two: it says how many minutes a process consumes, as a function of its drivers, and which pool's rate prices those minutes.

Everything a reader could ask about a number in the output traces back to one of those three objects. So the documentation has three page types, and the rule is one page per object. Not one section per object in a long document: one page, with its own owner, its own version and its own last-review date. When a pool is retired, its page is archived. When a driver changes source, its page changes and nothing else does.

This is the same discipline we ask of the model itself in how many cost pools is too many: an object earns a page by being distinct enough to need one. If two pools would have identical pages apart from the name, they are one pool.

What not to document. The method: a page that explains what a time equation is, or why practical capacity is used, belongs in training material, not in the model's documentation, where it goes stale and buries the fields that matter. The software: how the model is built in whatever tool it runs in is that tool's own documentation. The history of every discussion: the change log records what changed and who agreed; the arguments stay in the meeting notes. A page that has grown past one screen is a sign that two objects are on it.

02The relationship

How the three pages point at each other

The three page types are not independent. A time equation page names the pool that prices it and every driver it uses. A driver page lists the equations that use it. A pool page lists the equations it prices. Those cross-references are what make the set navigable in both directions: from an output number back to its inputs, and from a data field forward to every number it touches.

A cost pool page supplies a capacity cost rate to a time equation page. Driver pages supply the terms of the time equation. The time equation page prices transactions, which flow into the outputs: cost per order, per customer and per product. Page type A Cost pool page Resources, cost, practical capacity Output: capacity cost rate Page type B Driver page Definition, source field, quality Output: a term in an equation Page type C Time equation page Process, base time, one term per driver, coefficients Minutes × pool rate = cost of one transaction Outputs Cost per order Cost per customer Cost per product Unused capacity rate per minute terms priced minutes lists the equations it prices lists the equations that use it
One page per object. Solid lines carry values into the calculation; dashed lines are the back-references that let a reader move in the other direction.
03Page type A

The cost pool page: what the money is and what it can do

A pool page has one job: to let a reader recompute the capacity cost rate from named sources. If the page does not contain enough to do that, the rate is an opinion.

FieldMandatoryWhat goes in itWhy it is there
Pool name and IDYesA short name and a stable code that never changes when the name doesEquations reference the ID, so renaming a pool cannot break them
OwnerYesOne named person, with a deputyA pool with no owner is the first one to go stale
Resources includedYesThe people, machines, systems and space whose cost sits in the pool, by cost centre or accountThe boundary of the pool is the most contested thing about it
Resources excludedYesAnything a reader might expect to find here and will not, with the pool it lives in insteadSilent exclusions are how the same cost ends up in two pools
Total cost and sourceYesThe amount, the period, the ledger accounts or cost centres, and the extract dateRecomputation needs the sources, not just the sum
Capacity unitYesMinutes of labour, machine hours, pallet positions, and so onThe rate is meaningless without it
Theoretical and practical capacityYesBoth figures and the reasoning for the gap (breaks, setup, maintenance, training)Practical capacity is the assumption that moves the rate most
Capacity cost rateYesTotal cost divided by practical capacity, stated per unitThe one number the equations consume
Equations priced by this poolYesThe list of equation IDsBack-reference; also the blast radius of a rate change
Known weaknessesYesWhere the boundary is approximate, where the capacity figure is an estimate, what should replace itA documented approximation is honest; a silent one costs credibility
Version, date, change logYesVersion number, last review date, next review date, and one line per changeAnyone can tell whether the page still describes the model in use
Seasonality noteNoWhether capacity or cost varies materially across the yearUseful for monthly models; irrelevant for annual ones

The rate is derived on the page, not pasted from the system. When the two disagree, the page is the audit trail that shows which one moved.

04Page type B

The driver page: which field, from where, and how good it is

A driver page documents a field in your data, not a concept. "Order complexity" is a concept; "number of order lines on the sales order, table VBAP, field POSNR count" is a driver. The page exists to make the second kind explicit, because the first kind is what people write down when they have not decided yet.

FieldMandatoryWhat goes in itWhy it is there
Driver name and IDYesShort name and stable codeEquations reference the ID
OwnerYesThe person who can answer for the data, usually closer to the source system than to financeDriver quality is a data question before it is a costing question
Definition in one sentenceYesWhat the driver counts or flags, in words the operational team usesThe team has to recognise it to defend it
TypeYesQuantity (a count or a duration) or condition (a flag worth zero or one)Decides how the driver enters an equation
Source system, table, fieldYesExact location, plus the extraction query or report nameA driver that cannot be pulled for every transaction models nothing
GrainYesThe level at which the value exists: per line, per order, per shipment, per customer per monthMismatched grain is the most common silent error in a model
Coverage and qualityYesShare of transactions with a populated value, known gaps, how gaps are treatedReader needs to know how much of the answer rests on defaults
Value range and sanity checksYesTypical values, plausible maximum, the check that catches a broken extractThe check that catches a zero-filled column before the model publishes it
Equations that use itYesThe list of equation IDsBack-reference; also the blast radius of a source change
Why this driver and not anotherYesThe alternatives considered and the reason this one won, in two or three linesStops the same debate being reopened every year
Version, date, change logYesAs for the pool pageAs for the pool page

The tests a driver has to pass before it earns a page are in the cost driver library: it moves the minutes, it exists as a field, the team recognises it.

05Page type C

The time equation page: the minutes, and where each one comes from

The equation page is the one most readers open first, because it is where a cost becomes visible. It has to show the equation itself, the origin of every coefficient, and the range over which the equation has been checked against reality.

FieldMandatoryWhat goes in itWhy it is there
Equation name and IDYesThe process it describes, and a stable codeReferenced by the pool and driver pages
OwnerYesUsually the supervisor of the process, with finance as deputyThe person who can say whether the minutes are still true
Process boundaryYesThe first and last step included, written as the team would describe themTwo equations that overlap double-count a step
Pricing poolYesThe pool ID whose rate prices these minutesOne equation, one pool. If a process spans two pools, it is two equations
The equationYesBase time plus one term per driver, with the driver IDsThe object itself
Origin of each coefficientYesObserved (how many observations, when), estimated by whom, or taken from a standardSeparates the measured minutes from the guessed ones
Validation rangeYesThe driver values over which the equation has been checked; outside that range it extrapolatesA base time observed on ten-line orders says little about two-hundred-line ones
ReconciliationYesTotal minutes implied by the equation for the period, against the pool's practical capacityAn equation that consumes more minutes than the pool has is wrong somewhere
Worked exampleYesOne real-shaped transaction, run through the equation to a costThe fastest way for a new reader to understand it
Known weaknessesYesTerms that are approximations, drivers that are proxies, what should replace themAs for the pool page
Version, date, change logYesAs for the pool pageAs for the pool page

The shape of a time equation, and the reference set of terms by activity, is in the time equations reference.

06Filled example

One pool, one driver, one equation, filled in

Illustrative example. Invented figures, chosen to show the shape of the pages, not taken from any client.

Imagine a distributor with an order desk of six people who enter and amend customer orders. The three pages below are what the pattern produces for that one process. The numbers are made up; the structure is the point.

Cost pool pageP-03 Order desk
OwnerCustomer service manager; deputy: management accountant
Resources includedSix order-desk staff (cost centre 4210), their share of the order-management system licence (account 6420), their share of office space (account 6110, by headcount)
Resources excludedCredit control (in P-04), field sales (in P-07), the ERP itself (in P-11 IT shared services)
Total cost and sourceEUR 312,000 for the calendar year, ledger extract dated 15 January, accounts and cost centres listed above
Capacity unitMinutes of staff time
Theoretical and practical capacityTheoretical: 6 people × 220 days × 8 hours × 60 = 633,600 minutes. Practical, at 80% after breaks, training, meetings and system downtime: 506,880 minutes
Capacity cost rate312,000 / 506,880 = EUR 0.6155 per minute
Equations pricedE-03 Order entry, E-04 Order amendment, E-09 Customer query (order status)
Known weaknessesThe 80% practical capacity is the standard assumption, not measured for this team. A two-week time log is scheduled for the second quarter to replace it
Version and datesv1.2; last reviewed 20 January; next review 20 July; change log: v1.1 added the system licence share, v1.2 moved credit control out to P-04
Driver pageD-01 Order lines
OwnerERP data analyst; deputy: management accountant
DefinitionThe number of distinct product lines on a confirmed customer order
TypeQuantity, per order
SourceSales order line table, count of line items per order number, extracted by the monthly "orders by line" report
GrainPer order; aggregated to customer per month for reporting
Coverage and quality100% of confirmed orders; cancelled lines are excluded by the report filter
Value range and checksTypical 1 to 40, plausible maximum 400; the check flags any month where the average moves by more than 15%
Equations that use itE-03 Order entry, E-05 Picking, E-07 Invoicing
Why this driverOrder value was considered and rejected: a large order is not a long order. Order count alone was rejected: it flattens a two-line order and a sixty-line one
Version and datesv1.0; last reviewed 20 January; next review 20 July
Time equation pageE-03 Order entry
OwnerOrder desk supervisor; deputy: management accountant
Process boundaryFrom the order arriving (email, portal or EDI) to the order being confirmed in the system. Excludes credit release and any later amendment
Pricing poolP-03 Order desk, EUR 0.6155 per minute
The equationMinutes = 4 + 0.7 × D-01 (order lines) + 6 × D-12 (manual channel flag)
Origin of coefficientsBase time 4 minutes and 0.7 per line: observed over 60 orders across two weeks in January by the supervisor. Manual channel penalty of 6 minutes: supervisor estimate, not yet observed
Validation range1 to 45 lines. Orders above 45 lines are rare and were not observed; the equation extrapolates there
Reconciliation18,400 orders in the year, average 9.2 lines, 38% manual: implied 18,400 × (4 + 0.7 × 9.2 + 6 × 0.38) = 234,000 minutes, 46% of the pool's practical capacity. The other two equations priced by P-03 account for a further 41%; the remaining 13% is unused capacity
Worked exampleA manual order with 12 lines: 4 + 0.7 × 12 + 6 = 18.4 minutes × 0.6155 = EUR 11.33
Known weaknessesThe manual channel penalty is an estimate; it is on the same observation plan as the practical capacity figure in P-03
Version and datesv1.1; last reviewed 20 January; next review 20 July; change log: v1.1 added the manual channel term after the supervisor challenged the flat base time

Read the three pages together and the whole chain is visible: the ledger accounts behind the rate, the ERP field behind the driver, the observation behind each coefficient, and the reconciliation that says the equation fits inside the capacity it is charged against.

07The template

A downloadable template, and what is in it

The Excel file below carries the three page types as three sheets, with the mandatory fields as rows, a column for your entry, a column with the filled example from the section above, and a short guidance note per field. A fourth sheet is the register: one row per page, with ID, owner, version and next review date, so the whole set can be scanned in one screen.

  1. Sheet "Read me". The one-page-per-object rule, the naming convention for IDs (P for pools, D for drivers, E for equations), and the review cadence.
  2. Sheet "Cost pool". The twelve fields of page type A, with the P-03 example filled in beside the blank column.
  3. Sheet "Driver". The eleven fields of page type B, with the D-01 example.
  4. Sheet "Time equation". The eleven fields of page type C, with the E-03 example.
  5. Sheet "Register". One row per page: type, ID, name, owner, version, last review, next review, status.

Copy a sheet for each object. A model with 8 pools, 14 drivers and 22 equations has 44 pages, and the register shows at a glance which of them is overdue.

No sign-up. The example figures inside the file are the illustrative ones from this page.

08Keeping it alive

The three rules that stop the pages going stale

A change to the model is a change to a page first. Nobody edits a rate, a driver source or a coefficient in the system before the page carries the new value, the reason and a version bump. It sounds bureaucratic and it takes four minutes. What it buys is that the page never lags the model, which is the only state in which documentation is worth reading.

Every page has a next-review date, and the register is reviewed monthly. Six months is a sensible default for pools and equations; drivers can go a year if their source system is stable. The monthly review of the register is a ten-minute scan for overdue pages, not a review of the pages themselves.

Known weaknesses is a mandatory field and it is never empty. Every page has at least one. A page whose weaknesses field says "none" has not been thought about. The field is also the model's roadmap: sort all pages by their weaknesses and the next improvement project writes itself.

The index and the change log. The register is the index of the set: sorted by last review date, it puts the stale pages at the top. Below it sits the model's change log: date, object, what changed, who approved it, one line each. When a pool's rate moves because the roster changed, the log says so on the day, and a year later the movement in a customer's cost can be traced back to that line. The monthly drift tests write to the same log, so a test that failed and was overridden is on record with the reason.

Where this pattern sits in the wider question of model governance, and how it is scored, is in costing tools and governance; the failure modes it prevents are the ones in why costing models fail after go-live.

09Common mistakes

Five ways the pattern gets broken

One document instead of one page per object. A long manual is edited by nobody because every edit needs the whole thing re-read. Pages are edited by their owners because each one is small.

Pages without owners. A page owned by "finance" is owned by nobody. One name, one deputy.

Concept drivers. "Complexity", "effort", "customer demands" are not drivers until they name a field. If the field does not exist yet, the driver page says so and lists the capture plan.

Coefficients with no origin. A minute value with no note on where it came from is indistinguishable from a guess, and will be treated as one the first time it is challenged.

No reconciliation. An equation page that does not compare implied minutes with pool capacity can hide an equation that consumes 140% of the people it is charged against. The reconciliation line is the single cheapest check in the whole pattern.

10FAQ

Fair questions.

What documentation does a cost model need?
Three page types and nothing else: one page per cost pool, one per driver and one per time equation. Each page has a fixed set of mandatory fields, an owner, a version and a review date, and cross-references the other pages it depends on. A register lists every page in one table. That set lets a reader trace any output number back to a ledger account, a data field and an observed coefficient.
Why one page per object rather than one manual?
Because a manual is edited by nobody and a page is edited by its owner. Changes to a model are local: a driver changes source, a pool boundary moves, a coefficient is re-observed. One page per object means the change touches one document, one owner and one version number, and the rest of the set stays valid.
What is the most important field on a cost pool page?
Practical capacity, with the reasoning for the gap from theoretical. It is the assumption that moves the capacity cost rate the most, it is usually an estimate rather than a measurement, and it is the first thing a reviewer should challenge. The second most important field is the list of excluded resources, because silent exclusions are how a cost lands in two pools.
How do you document a cost driver?
As a field, not a concept: the source system, table and field, the grain at which the value exists, the coverage across transactions, the sanity check that catches a broken extract, the equations that use it, and a short note on why this driver won over the alternatives considered. A driver whose page cannot name a field is a driver the model does not have yet.
What should a time equation page contain?
The process boundary, the pricing pool, the equation with its driver IDs, the origin of every coefficient (observed, estimated or standard), the range of driver values over which it was validated, a reconciliation of implied minutes against the pool's practical capacity, one worked example, and the known weaknesses. The reconciliation line is the cheapest check in the model and the most often skipped.
How often should the documentation be reviewed?
Every page carries its own next-review date; six months is a sensible default for pools and equations, a year for drivers with stable sources. Separately, the register is scanned monthly for overdue pages, which takes ten minutes. And any change to the model updates the relevant page first, before the system, so the documentation never lags what is actually running.
Reference series

Is your model documented well enough to be trusted?

The Profit Check scores tools and governance as one of its seven dimensions, alongside the six that decide whether the numbers are right in the first place.

Duration
10 minutes
You receive
Score, 7 dimensions, sector benchmark
We ask for
Name, organisation, work email, industry, size
Cover of the video: how to calculate cost to serve in five stepsRelated video · 2 min 34How to calculate cost to serve in five stepsThe five TDABC steps, one wholesale example and the break-even in minutes.Watch the video and read the transcript →

Proof

A distributor in New Zealand. €1.335M of cost-to-serve made visible, then halved, and 830 loss-making customers brought down to 295.

Read the case study →

Who you would be talking to

Miguel Guimarães, Founding Partner

Cost and profitability practitioner for 25+ years. Presented the Damco cost-to-serve case at Managing for Profit (Amsterdam RAI, December 2009), on the same programme as Robert S. Kaplan.

Call +351 910 313 731

Workshops

Bring the method into the room.

One working profitability model, built from real data, that you take home at the end.

Reserve a seat
Miguel Guimarães

Reviewed by

Miguel Guimarães

Founding Partner, Cost and Profitability Consulting

Time-Driven ABC engagements since 2010, working within the Kaplan and Anderson framework.

About the author →

Published

M
Ask us anything
usually replies in minutes
Hi. I can answer the quick questions about cost, method and timing right here. For anything specific to your business, I'll connect you with a CostCtrl specialist on WhatsApp.
No bot loops. Straight to a specialist.
Most read
  1. 1Time-driven activity-based costing: ABC made simple and scalable
  2. 2Whale Curve: Definition, How to Build One, Live Simulator
  3. 3Cost-Volume-Profit (CVP) and Break-Even Analysis
  4. 4How to calculate cost to serve, step by step
  5. 5Cost-to-Serve Analysis
  6. 6Make-or-Buy and Relevant Costs
  7. 7TDABC vs ABC: same goal, very different effort
  8. 8Pocket Price Waterfall and Price Realization
  9. 9Transfer Pricing for Internal Profitability
  10. 10Cost-to-Serve, Profitability and AI: Executive Workshop Porto - November 27, 2026